1. Service time in queuing theory is usually assumed to follow
A. Normal distribution
B. Poissons distribution
C. Erlang distribution
D. Exponential law
Answer : D
2. The time taken by a trained worker to perform an operation, while working a steady pace, is known as
A. Standard time
B. Normal time
C. Representative time
D. None of these
Answer : A
3. The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most likely time)
A. (to + tp + tn)/3
B. (to + 2tp + tn)/4
C. (to + 4tp + tn)/5
D. (to + tp + 4tn)/6
Answer : D
4. Queueing theory deals with problems of
A. Material handling
B. Reducing the waiting time or idle time
C. Better utilization of man services
D. Effective use of machines
Answer : B
5. Statistical quality control techniques are based on the theory of
A. Quality
B. Statistics
C. Probability
D. All of the above
Answer : C
6. PERT is applied for
A. Marketing programmes and advertising programmes
B. Installation of machinery
C. Research and development of products
D. All of these
Answer : D
7. Time study is carried out to determine the time required to complete job by
A. A slow worker
B. A fast worker
C. An average worker
D. An apprentice
Answer : C
8. The critical path of a network represents
A. The minimum time required for completion of project
B. The maximum time required for completion of project
C. Maximum cost required for completion of project
D. Minimum cost required for completion of project
Answer : A
9. What does symbol 'V' employ in work study
A. Operation
B. Inspection
C. Delay/ temporary Storage
D. Permanent storage
Answer : D
10. Which of the following statement is wrong?
A. An activity consumes time and resources whereas an event does not consume time or resources.
B. The performance of a specific task is called an activity.
C. An event is an instantaneous point in time at which an activity begins or ends.
D. The turning of a job on lathe is an event whereas job turned is an activity.
Answer : D
11. PERT is the
A. Time oriented technique
B. Event oriented technique
C. Activity oriented technique
D. Target oriented technique
Answer : B
12. Which of the following charts are used for plant layout design?
A. Operation process chart
B. Man machine chart
C. Travel chart
D. All of these
Answer : D
13. PERT and CPM are
A. Techniques to determine project status
B. Decision making techniques
C. Charts which increase aesthetic appearance of rooms
D. Aids to the decision maker
Answer : D
14. The basic difference between PERT and CPM is that
A. PERT deals with events and CPM with activities
B. Critical path is determined in PERT only
C. Costs are considered on CPM only and not in PERT
D. Guessed times are used in PERT and evaluated times in CPM
Answer : D
15. Queuing theory is associated with
A. Sales
B. Inspection time
C. Waiting time
D. Production time
Answer : C
16. The probability distribution of activity times in PERT follows following distribution
A. Normal
B. Binomial
C. Beta
D. Exponential
Answer : C
17. Micro motion study is
A. Analysis of a man-work method by using a motion picture camera with a timing device in the field of view
B. Motion study observed on enhanced time intervals
C. Motion study of a sequence of operations conducted systematically
D. Study of man and machine conducted simultaneously
Answer : A
18. The main advantage of line organisation is its
A. Effective command and control
B. Defined responsibilities at all levels
C. Rigid discipline in the organisation
D. All of the above
Answer : D
19. The employees provident fund act is applicable to
A. All industries
B. All industries other than small and medium industries
C. Volunteers
D. The industries notified by Government
Answer : D
20. What does symbol 'O' imply in work study?
A. Operation
B. Inspection
C. Transport
D. Delay/temporary storage
Answer : A
21. Discrepancies of bar chart techniques are
A. Consequential effects of lack in one activity on the finish date
B. Free time available for an activity can't be predicted
C. Effective monitorig/controlling can't be done
D. All of the above
Answer : D
22. The most important objective behind plant layout is
A. Overall simplification, safety of integration
B. Economy in space
C. Maximum travel time in plant
D. To provide conveniently located shops
Answer : A
23. The time required to complete a task is established and a bonus is paid to the worker for every hour he saves from the established time required. This type of incentive plan is known as
A. Rowan Plan
B. Taylor Differential Piece rate system
C. Halsey Premium plan
D. Day work plan
Answer : C
24. One of the basic essentials of an incentive plan is that
A. A differential piece rate system should exist
B. Minimum wages should be guaranteed
C. Provide incentive to group efficiency performance
D. All standards should be based on time studies
Answer : D
25. The value engineering technique in which experts of the same rank assemble for product development is called
A. Delphi
B. Brain storming
C. Morphological analysis
D. Direct expert comparison
Answer : B
26. The most popular type of organisation used for Civil Engineering Constructions is
A. Line organisation
B. Line and staff organisation
C. Functional organisation
D. Effective organisation
Answer : A
27. Critical path moves along the activities having total float of
A. Positive value
B. Negative value
C. Zero value
D. Same value
Answer : C
28. Works cost implies
A. Primary cost
B. Factory cost
C. Factory expenses
D. Primary cost + factory expenses
Answer : D
29. Percent idle time for men or machines is found by
A. Work sampling
B. Time study
C. Method study
D. Work study
Answer : A
30. Breakeven analysis is a
A. Short term analysis
B. Long term analysis
C. Average of short and long term analysis
D. Any one of these
Answer : A
31. Father of time study was
A. F.W. Taylor
B. H.L. Gantt
C. F.B. Gilbert
D. R.M. Barnes
Answer : A
32. O on a PERT/CPM chart represents
A. An ordinary event
B. A significant event representing some milestone
C. An event to be transferred to other network chart
D. Dangling event
Answer : A
33. In Emerson's efficiency plan of wage incentive system, bonus is paid to a worker
A. Whose output exceeds 67% efficiency
B. On the percentage of time saved
C. On the percentage of time worked
D. On the percentage of standard time
Answer : A
34. In A-B-C analysis, which class of items are generally large in number?
A. A
B. B
C. C
D. None of these
Answer : C
35. Work study involves
A. Only method study
B. Only work measurement
C. Method study and work measurement
D. Only motion study
Answer : C
36. A feasible solution to the linear programming problem should
A. Satisfy the problem constraints
B. Optimise the objective function
C. Satisfy the problem constraints and non-negativity restrictions
D. Satisfy the non-negativity restrictions
Answer : C
37. Merit Rating is the method of determining worth of
A. A job
B. An individual employee
C. A particular division in workshop
D. Machine
Answer : B
38. For a product layout the material handling equipment must
A. Have full flexibility
B. Employ conveyor belts, trucks, tractors etc.
C. Be a general purpose type
D. Be designed as special purpose for a particular application
Answer : D
39. Slack represents the difference between the
A. Latest allowable time and the normal expected time
B. Latest allowable time and the earliest expected time
C. Proposed allowable time and the earliest expected time
D. Normal allowable time and the latest expected time
Answer : B
40. Time study is carried out
A. By finding all the significant informations regarding the job, work place and machine tool etc.
B. By breaking up each operation into small elements which are measurable with the help of the measuring device accurately
C. By observing and recording the time taken by the operator for an operation
D. All of the above
Answer : D
41. The type of organisation preferred for an automobile industry, is
A. Line organisation
B. Functional organisation
C. Line and staff organisation
D. Line, staff and functional organisation
Answer : C
42. In Halsey 50-50 plan, output standards are established
A. By time study
B. From previous production records
C. From one's judgement
D. All of the above
Answer : B
43. Military type of organisation is known as
A. Line organisation
B. Functional organisation
C. Line and staff organisation
D. Line, staff and functional organisation
Answer : A
44. Break-even analysis consists of
A. Fixed expenses
B. Variable cost
C. Sales revenue
D. All of these
Answer : D
45. According to Rowan plan of wage incentive system, bonus is paid to a worker
A. Whose output exceeds 67% efficiency
B. On the percentage of time saved
C. On the percentage of time worked
D. On the percentage of standard time
Answer : C
46. The difference between the time available to do the job and the time required to do the job, is known as
A. Event
B. Float
C. Duration
D. Constraint
Answer : B
47. Work study is mainly aimed at
A. Determining the most efficient method of performing a job
B. Establishing the minimum time of completion of a job
C. Developing the standard method and standard time of a job
D. Economising the motions involved on the part of the worker while performing a job
Answer : A
48. Routing
A. Prescribes the sequence of operations to be followed
B. Determines the programme for the operations
C. Is concerned with starting of processes
D. Regulates the progress of job through various processes
Answer : A
49. Performance rating is equal to
A. Observed performance + normal performance
B. Observed performance - normal performance
C. Observed performance × normal performance
D. None of the above
Answer : D
50. The appellate authority for an industrial dispute is
A. Management
B. Labour court
C. High court/supreme court
D. Board of directors
Answer : C

Sharing is caring