Related Questions
What is the correct answer?
4
When lettering a CAD drawing, for clarity you should limit the number of fonts to:
What is the correct answer?
4
In order to create an accurate assembly drawing the drafter should create the ________ drawings first.
What is the correct answer?
4
The distance a screw thread advances axially in one turn is the:
What is the correct answer?
4
This material is used in masonry construction, most commonly for ornamental facing:
What is the correct answer?
4
The UCS icon represents the intersection of the ________.
What is the correct answer?
4
This is used in drawings to represent the edge of a solid object:
What is the correct answer?
4
Architectural drafters generally prefer to use ________ drawings to help illustrate 3-dimensional views of a structure.
What is the correct answer?
4
The standard number of threads per inch for various diameters is the:
What is the correct answer?
4
In multi-view drawing it is common practice to include three views, the front, the top and the right side. If no dimensions are required on the right side view the drafter can ________.
C. Use the left view instead
What is the correct answer?
4
The title block used on working drawings should include the __________.
What is the correct answer?
4
Traditional drafters need to be able to create several different line widths because ________.
A. Different line widths convey different information
B. The line width has to do with how dark it appear in the finished drawing
C. They seem to transmit better in a fax machine
D. It makes no difference
What is the correct answer?
4
This type of solid has a polygon for a base and triangular lateral faces that intersect at a vertex:
What is the correct answer?
4
Once the architect has finalized the house plans with the client any changes to the design requested by the client will require a ________.
C. Whole new set of drawings
What is the correct answer?
4
In order to create one solid model from two or more separate solid shapes the drafter will need to position them and then ________.
A. Use Union to join them
C. Use the Add Parts tool
What is the correct answer?
4
Using this as a communication and design review tool can help shorten the process and eliminate productivity barriers:
B. Portable document files
C. The Internet and e-mail
What is the correct answer?
4
A civil engineer working on a bridge design would probably rely on his ________ scale for checking printed drawings.
What is the correct answer?
4
9.The lines used to create the auxiliary view should appear as ________ in the finished view.
What is the correct answer?
4
One critical issue drafters need to pay close attention to is the ________.
What is the correct answer?
4
Center lines are used to locate or represent the centers of ________.
What is the correct answer?
4
When positioning this feature of perspective projection, the centerline of the cone of visual rays should be directed toward the approximate center of the object:
What is the correct answer?
4
If a plane is parallel to the plane of projection, it appears:
What is the correct answer?
4
When creating an isometric drawing in Auto-CAD the drafter can utilize the Dynamic Input and Polar Coordinate system to place both vertical and horizontal lines. A line created from one point 3 inches at 180 degrees would be a ________ line.
What is the correct answer?
4
When using the direct entry method to create a horizontal line exactly three inches long the drafter should ________ first.
A. Pull the line from away from the starting point very carefully
B. Insure that Ortho is on
C. Enter 3 for the length of the line
D. Read the coordinate position on the Dynamic Readout
What is the correct answer?
4
The architectural drafter usually begins a set of working drawings by creating the ________ plan first.
What is the correct answer?
4
Architectural drawings used to construct a house are often plotted with a scale of ¼ = 1'-0. What scale is this?
What is the correct answer?
4
To avoid having to dimension to a hidden feature the drafter can utilize a ________ section.
What is the correct answer?
4
On a floor plan the dashed line that appears approximately 24 outside the exterior wall represents the __________.
What is the correct answer?
4
This type of weld is the most common in structural steel fabrication:
What is the correct answer?
4
This is a systematic approach that integrates the design and manufacture of products with the goal of optimizing the process:
A. Traditional engineering design
B. The manufacturing process
What is the correct answer?
4
Some traditional board drafters preferred the drafting machine over the parallel straight edge because it could be used without the need for________.