4

4.The principle reason for using an auxiliary view is ________.

A. To eliminate hidden lines

B. To create a true projection plane from an inclined plane in one of the primary views

C. To show cylinders as ellipses

D. To locate center marks

Correct Answer :

B. To create a true projection plane from an inclined plane in one of the primary views


Related Questions

What is the correct answer?

4

This is used to indicate that a surface is to be machined:

A. Finish mark

B. Machining mark

C. Roughness indicator

D. Coordinate mark

What is the correct answer?

4

Oblique drawings are dimensioned in a similar fashion as these types of drawings:

A. Orthographic

B. Isometric

C. Angular

D. Parallel

What is the correct answer?

4

A full scale technical drawing will have a scale factor of ________.

A. 1 : 1

B. 1 : 2

C. 2 : 1

D. 1 : 4

What is the correct answer?

4

This practice considers an individual part's dimensions and tolerances and that part's relation to its related parts:

A. Applying allowances

B. Geometric dimensioning and tolerancing

C. Creating datum references

D. Angular dimensioning tolerances

What is the correct answer?

4

When filling an area with a hatch pattern in Auto-CAD the drafter needs to be able to ________.

A. See the entire bounding area to hatch

B. Set Ortho on

C. Turn ISO grid off

D. Set the layer to Defpoints

What is the correct answer?

4

Center lines are used to locate or represent the centers of ________.

A. Arcs

B. Circles

C. Hidden round features

D. All of the above

What is the correct answer?

4

These types of pipes are generally connected with bell and spigot joints or flanged joints:

A. Soil and waste

B. Water and gas

C. Water and steam

D. Gas and soil

What is the correct answer?

4

The site plan illustrates ________.

A. The floor plan

B. Where the house sits on the property

C. The roof plan

D. Where the garage and driveway are located

What is the correct answer?

4

The most common geometric form used in gears today is this:

A. Involute profile

B. Convolute profile

C. Base circle

D. Spur circle

What is the correct answer?

4

To insure that everyone understands what the electrical symbols represent it is customary to include a ________ on the electrical sheet.

A. List

B. Part number

C. Electrical legend

D. Electrical layer

What is the correct answer?

4

Acceptable parts must not extend beyond this:

A. Boundary limits

B. Hole limits

C. Specification

D. Tolerances

What is the correct answer?

4

In some circumstances an entire drawing can be inserted into a different drawing as a block. When this is used the base point will default to ________.

A. 0, 0

B. 10, 10

C. 20, 20

D. 30, 30

What is the correct answer?

4

The ________ tool on the Dimension tool bar will place several dimensions at one time by using a selection box placed over several part features.

A. Linear

B. Continue

C. Baseline

D. Quick Dimension

What is the correct answer?

4

Which of the following is one of the basic types of welded joints:

A. T-joint

B. Rear joint

C. Angle joint

D. Groove joint

What is the correct answer?

4

This type of solid has two bases that are parallel equal polygons:

A. Pyramid

B. Prism

C. Cone

D. Torus

What is the correct answer?

4

There should be a visible gap between the wall and the ________ line.

A. Dimension

B. Extension

C. Center

D. Leader

What is the correct answer?

4

The Conceptual Visual Style tool is located on the ________ toolbar.

A. Visual Styles

B. Modify

C. 3-D Modeling

D. All of the above

What is the correct answer?

4

This is the measured size of a finished part:

A. Actual size

B. Dimensioned size

C. Production size

D. Basic size

What is the correct answer?

4

When creating a block the drafter needs to pay particular attention to selecting a base point because it determines the ________.

A. Scale

B. Rotation angle

C. Insertion point

D. Color

What is the correct answer?

4

A line with a tapering width can be easily created by using the __________ tool.

A. Circle

B. Ellipse

C. Line

D. Polyline

What is the correct answer?

4

Baseline dimensions are referenced from a common geometric feature known as a ________.

A. Edge

B. Corner

C. Datum

D. Point of reference

What is the correct answer?

4

To avoid having to dimension to a hidden feature the drafter can utilize a ________ section.

A. Whole

B. Half

C. Broken out

D. All of the above

What is the correct answer?

4

The ________ dimension tool will place the length of an angled line.

A. Aligned

B. Angle

C. Linear

D. Radial

What is the correct answer?

4

This type of solid is formed by sweeping a shape along a linear path:

A. Planar solid

B. Revolved solid

C. Warped solid

D. Extruded solid

What is the correct answer?

4

If designs require changes, they should be documented with:

A. Development plans

B. Product proposals

C. Document reviews

D. Engineering change orders

What is the correct answer?

4

Architectural dimensioning standards allow for the placement of dimensions inside the floor plan. These inside dimensions locate interior __________.

A. Door openings and walls

B. Centers of cabinets

C. Windows

D. All of the above

What is the correct answer?

4

The edges of a cube in isometric projection make angles of this many degrees with each other:

A. 30

B. 60

C. 90

D. 120

What is the correct answer?

4

In isometric projection, all distances are approximately this percentage of their true size:

A. 120 percent

B. 80 percent

C. 50 percent

D. 20 percent

What is the correct answer?

4

This type of projection is when projectors are parallel to each other, but is at an angle other than 90 degrees to the plane of projection:

A. Oblique projection

B. Perpendicular projection

C. Aesthetic projection

D. Angular projection

What is the correct answer?

4

An oil refinery relies on which type of drafter to maintain and update the technical piping drawings used for the construction and maintenance of the facility.

A. Architectural

B. Civil

C. Process piping

D. Electrical