Activities and events are clearly shown
Early start and late finish of an activity are clearly marked
Activity times are clear
Interrelationship among activities is clearly shown.
D. Interrelationship among activities is clearly shown.
Operation
Inspection
Delay/ temporary Storage
Permanent storage
Taylor
Drucker
McGregor
Galileo
Prescribes the sequence of operations to be followed
Determines the programme for the operations
Is concerned with starting of processes
Regulates the progress of job through various processes
Fixed cost
Variable cost
Fixed and variable costs
Operation costs
Batch production
Job production
Mass production
All of the above
An analytic tool in concept
Limit up of event oriented diagrams
Used for research and development projects
All of the above
Assist in finding out the most efficient way of doing work
Train the individual operator regarding the motion economy principles
Help in collecting the motion time data for synthetic time standards
All of the above
Marketing programmes and advertising programmes
Installation of machinery
Research and development of products
All of these
Work sampling
Time study
Method study
Work study
A project is divided into various activities
Required time for each activity is established
Sequence of various activities is made according to their importance
All of the above
Analysis of process chart
Flow of material
Ordering schedule of job
Controlling inventory costs money
Analysis of a man-work method by using a motion picture camera with a timing device in the field of view
Motion study observed on enhanced time intervals
Motion study of a sequence of operations conducted systematically
Study of man and machine conducted simultaneously
Total cost is more than the sales revenue
Total cost is less than the sales revenue
Total cost is equal to sales revenue
Fixed cost is equal to variable cost
Latest start time of succeeding event earliest finish time of preceding event activity time
Latest start time of the event earliest start time of the event
Latest finish time of event earliest finish time of the event
Anyone of the above
Hoist
Jib crane
Portable elevator
Chain conveyor
Permits a fine breakdown of activities and delays
Simultaneous study of many operators may be made by a single observer
Calculations are easier, method is economical and less time consuming
No time measuring devices are generally needed
Product layout
Process layout
Fixed position layout
Any one of these
Standard time
Normal time
Representative time
None of these
Inventory problems
Traffic congestion studies
Job-shop scheduling
All of the above
Earliest start time + duration of activity
Earliest start time duration of activity
Latest finish time + duration of activity
Latest finish time duration of activity
Functional organisation
Line organisation
Staff organisation
Line and staff organisations
Functional organisation
Line organisation
Staff organisation
Line, staff and functional organisations
Specialised and strict supervision is required
Machines can not be used to their maximum capacity
Manufacturing cost rises with a fall in the volume of production
All of the above
Fixed cost line
Variable cost line
Total cost line
Sales revenue line
Fast worker
Average worker
Slow worker
New entrant
Actions of operator
Layout of work place
Tooling and equipment
All of the above
PERT deals with events and CPM with activities
Critical path is determined in PERT only
Costs are considered on CPM only and not in PERT
Guessed times are used in PERT and evaluated times in CPM
TR
TR + [(S - T)/2] × R
TR + (S - T) × R
TR + [(S - T)/S] × R
All industries
All industries other than small and medium industries
Volunteers
The industries notified by Government
Manufacturing plant
Manufacturing plant and equipment
Inventories
Common stock held by the firm