Shows the inter dependences of various jobs
Depicts the delay of jobs, if any
Points outgoing ahead of schedule of jobs, if any
None of the above
D. None of the above
All industries have to necessarily train the apprentices
Industries have to train apprentices according to their requirement
All industries employing more than 100 workers have to recruit apprentices
Only industries employing more than 500 workers have to recruit apprentices
Total production cost is less
Material movement is less
Capital investment is minimum
All of these
Where low volume of production is required
Where similar jobs are manufactured on similar machines
Where machines are arranged on functional basis
All of the above
Specialised and strict supervision is required
Machines can not be used to their maximum capacity
Manufacturing cost rises with a fall in the volume of production
All of the above
When work should start and how much work should be completed during a certain period
When work should complete
That how idle time can be minimized
Proper utilisation of machines
Piece rate system
Group incentive plan
Profit sharing plans
Simplification
Value analysis
Network analysis
Linear programming
Queuing theory
Shows the inter dependences of various jobs
Depicts the delay of jobs, if any
Points outgoing ahead of schedule of jobs, if any
None of the above
Process chart
Material handling
Stop watch
All of the above
Improving present method and finding standard time
Motivation of workers
Improving production capability
Improving production planning and control
A symbol
An event
An activity
Standard symbol and colour
Earliest start time + duration of activity
Earliest start time duration of activity
Latest finish time + duration of activity
Latest finish time duration of activity
Consequential effects of lack in one activity on the finish date
Free time available for an activity can't be predicted
Effective monitoring/controlling can't be done
All of the above
An ordinary event
A significant event representing some milestone
An event to be transferred to other network chart
Dangling event
It represents a situation where extra resources are available and the completion of project is not delayed
It represents that a programme falls behind schedule and additional resources are required to complete the project in time
The activity is critical and any delay in its performance will delay the completion of whole project
Any one of the above
A project is divided into various activities
Required time for each activity is established
Sequence of various activities is made according to their importance
All of the above
Belt conveyor
Bucket conveyor
Fork lift truck
Overhead crane
Prescribes the sequence of operations to be followed
Determines the programme for the operations
Is concerned with the starting of processes
Regulates the progress of job through various processes
Prescribes the sequence of operations to be followed
Determines the programme for the operations
Is concerned with starting of processes
Regulates the progress of job through various processes
Analysis of a man-work method by using a motion picture camera with a timing device in the field of view
Motion study observed on enhanced time intervals
Motion study of a sequence of operations conducted systematically
Study of man and machine conducted simultaneously
Critical path method is an improvement upon bar chart method
Critical path method provides a realistic approach to the daily problems
Critical path method avoids delays which are very common in bar chart
All of the above
Breakeven analysis
Value analysis
Linear programming
Queueing theory
Product layout
Process layout
Fixed position layout
A combination of line and process layout
Maximum slack
Minimum slack
Zero slack
Average slack
Halsey plan
Rowan plan
Haynes plan
Emerson's plan
Satisfy the problem constraints
Optimise the objective function
Satisfy the problem constraints and non-negativity restrictions
Satisfy the non-negativity restrictions
Factory expenses
Selling expenses
Administrative expenses
All of these
Helps in ascertaining time schedules
Makes better and detailed planning possible
Provides a standard method for communicating project plans schedules and to time and cost performance
All of the above
Inspection
Transport
Delay/temporary storage
Permanent storage
Consumes time, but no resources
Consumes resources but no time
Consumes neither time nor resources
Is a dangling event