Related Questions
What is the correct answer?
4
These types of projectors converge at a vanishing point:
What is the correct answer?
4
Some common blocks used by architectural drafters include ________.
What is the correct answer?
4
Using this as a communication and design review tool can help shorten the process and eliminate productivity barriers:
B. Portable document files
C. The Internet and e-mail
What is the correct answer?
4
Dimension text is generally placed above the ________ line.
What is the correct answer?
4
These breaks are used to shorten the view of an object:
What is the correct answer?
4
In an assembly section, these parts should have their section lines left out or shown solid black:
What is the correct answer?
4
This means that a feature of a finished product contains the maximum amount of material permitted by the tolerance dimensions for that feature:
A. Maximum material condition
B. Machined material condition
C. Maximum machined indication
D. Machine mark indication
What is the correct answer?
4
This type of circuit is a semiconductor wafer or chip:
What is the correct answer?
4
This should show what changes were made, when, and by whom:
What is the correct answer?
4
These are lines drawn on a map to locate, in the plan view, points of equal ground elevation:
What is the correct answer?
4
When using the direct entry method to create a horizontal line exactly three inches long the drafter should ________ first.
A. Pull the line from away from the starting point very carefully
B. Insure that Ortho is on
C. Enter 3 for the length of the line
D. Read the coordinate position on the Dynamic Readout
What is the correct answer?
4
In isometric projection, all distances are approximately this percentage of their true size:
What is the correct answer?
4
Understanding the Cartesian coordinate system will help the beginning drafter ________.
A. Control the accuracy of the drawing
B. Produce a visible grid system
C. Select a different text style
D. Choose various line types
What is the correct answer?
4
This is a systematic approach that integrates the design and manufacture of products with the goal of optimizing the process:
A. Traditional engineering design
B. The manufacturing process
What is the correct answer?
4
A partial auxiliary view is used to show only the ________ in the auxiliary view.
A. Projected inclined plane
B. The projected top view
C. The projected side view
What is the correct answer?
4
These plans, made by the steel fabricator, are assembly drawings for the steel structure:
What is the correct answer?
4
This is a flat or rounded tab protruding from a surface, usually to provide a method for attachment:
What is the correct answer?
4
The architectural and construction industries use the United States National CAD standard (NCS) system on many ________ projects.
What is the correct answer?
4
There should be a visible gap between the wall and the ________ line.
What is the correct answer?
4
An architect often relies on a ________ to complete the set of technical drawings used in the design of an office building.
D. Construction superintendent
What is the correct answer?
4
This is formed where three or more surfaces intersect:
What is the correct answer?
4
Placement of dimensions on a drawing is controlled by ________.
C. Corporate drafting standards
What is the correct answer?
4
The first step in creating a traditional technical drawing is to ________.
A. Draw a series of guide lines
C. Align the paper so that it will be positioned square to the parallel bar
D. Sharpen the leads in the technical pens
What is the correct answer?
4
Two-point perspective is also known as:
What is the correct answer?
4
Drawings created with commercial software are typically saved as:
What is the correct answer?
4
This type of axonometric drawing has equal foreshortening along two axis directions and a different amount on the third axis:
What is the correct answer?
4
Once the architect has finalized the house plans with the client any changes to the design requested by the client will require a ________.
C. Whole new set of drawings
What is the correct answer?
4
This is the range of digital or hard copy documents that specify the physical function requirements for a product:
What is the correct answer?
4
Welding drawings are a special type of this kind of drawing:
What is the correct answer?
4
The typical parts list should include the ________.
B. Manufacturing material
C. Number of parts needed