Latest start time of succeeding event earliest finish time of preceding event activity time
Latest start time of the event earliest start time of the event
Latest finish time of event earliest finish time of the event
Anyone of the above
D. Anyone of the above
Functional organisation
Line organisation
Staff organisation
Line and staff organisations
Product layout
Process layout
Fixed position layout
A combination of line and process layout
Creative phase, information phase, investigation phase, evaluation phase
Information phase, creative phase, investigation phase, evaluation phase
Investigation phase, information phase, creative phase, evaluation phase
Creative phase, investigation phase, evaluation phase, information phase
Sales turn over
Lowest competitive price
Various elements of the cost
All of the above
Organisation performance × motivation = profits
Knowledge × skill = ability
Ability × motivation = performance
Attitude × situation = motivation
Short run analysis
Long run analysis
Average of above two run analysis
There is no such criterion
Management
Labour court
High court/supreme court
Board of directors
Maximum slack
Minimum slack
Average slack
No slack
Effective running of stores
State of merchandise methods of storing and maintenance etc.
Stock control system
All of the above
Fast worker
Average worker
Slow worker
New entrant
Time oriented technique
Event oriented technique
Activity oriented technique
Target oriented technique
Line organisation
Functional organisation
Line and staff organisation
Line, staff and functional organisation
Fixed cost
Variable cost
Fixed and variable costs
Operation costs
Flow chart
Process chart
Travel chart
Operation chart
Optimum utilization of men, machines and materials
Lowest possible cost and shortest possible time for project
Timely execution of project
To produce best results under given constraints
Forecasting sales
Production schedule
Scheduling and routing
Linear programming
A standard rating system
A merit rating system
A job evaluation system
His individual performance
Emerson efficiency plan
Taylor plan
Halsey premium plan
Gilbert plan
Line organisation
Functional organisation
Line and staff organisation
Line, staff and functional organisation
That can't be analysed mathematically
Involving multistage queuing
To verify mathematical results
All of the above
The project time should change due to decompression
After decompression the time of an activity invariably exceeds its normal time
An activity could be decompressed to the maximum extent of its normal time
None of the above
Assist in finding out the most efficient way of doing work
Train the individual operator regarding the motion economy principles
Help in collecting the motion time data for synthetic time standards
All of the above
Optimistic time
Pessimistic time
Most likely time
All of the above
High initial investment for the specialized facilities
Skilled labour to operate machines
Production time is longer, requiring more goods in inventory
High cost of inspection
Is a basic technique of materials management
Is meant for relative inventory control
Does not depend upon the unit cost of the item but on its annual consumption
All of the above
Top level executives have to do excessive work
Structure is rigid
Communication delays occur
All of the above
A symbol
An event
An activity
Standard symbol and colour
To produce better quality of product
To utilise maximum floor area
To minimise production delays
All of these
A differential piece rate system should exist
Minimum wages should be guaranteed
Provide incentive to group efficiency performance
All standards should be based on time studies
Gantt chart
Bin chart
Emerson chart
Travel chart