Home
Current Affairs January 2024

What is the correct answer?

4

Approximately this much of the cost of product development and manufacture is determined at the design stage:

A. 40-50 %

B. 60-75 %

C. 70-80 %

D. 75-85 %

Correct Answer :

C. 70-80 %


Related Questions

What is the correct answer?

4

A typical set of mechanical working drawings includes ________.

A. Exploded assembly

B. Part details

C. Parts list

D. All of the above

What is the correct answer?

4

An advantage of this type of view is that each view shows the object all the way through as if it were transparent:

A. Planar

B. Horizontal

C. Auxiliary

D. Orthographic

What is the correct answer?

4

When positioning this feature of perspective projection, the centerline of the cone of visual rays should be directed toward the approximate center of the object:

A. Station point

B. Vanishing point

C. Horizon

D. Ground line

What is the correct answer?

4

The top, front, and bottom views align in this manner:

A. Horizontally

B. Vertically

C. According to the planar views

D. Parallel to the frontal plane

What is the correct answer?

4

Acceptable parts must not extend beyond this:

A. Boundary limits

B. Hole limits

C. Specification

D. Tolerances

What is the correct answer?

4

In the section view, the areas that would have been in actual contact with the cutting plane are shown with:

A. A cutting plane line

B. Section lining

C. Visible lines

D. Lines and arrows

What is the correct answer?

4

This allows the performance of structures to be analyzed and tested efficiently, accurately, and quickly:

A. Computer-aided manufacturing

B. Computer-aided design

C. Computer-aided engineering

D. Computer-aided prototyping

What is the correct answer?

4

Schematic and single-line diagrams should be arranged so that signal or transmission path from input to output proceeds in this fashion:

A. Right to left and top to bottom

B. Right to left and bottom to top

C. Left to right and top to bottom

D. Left to right and bottom to top

What is the correct answer?

4

When using versions of Auto-CAD prior to Release 2006 it may be necessary to ________ a block in order to edit it.

A. Copy

B. Explode

C. Offset

D. None of the above

What is the correct answer?

4

The bounding box method for setting up an isometric drawing helps the drafter ________.

A. Confine the isometric drawing to its maximum size

B. Figure what lines are to be illustrated vertical and horizontal

C. Position the isometric drawing in paper space

D. None of the above

What is the correct answer?

4

Once the architect has finalized the house plans with the client any changes to the design requested by the client will require a ________.

A. Change order

B. Modification slip

C. Whole new set of drawings

D. None of the above

What is the correct answer?

4

A line with a tapering width can be easily created by using the __________ tool.

A. Circle

B. Ellipse

C. Line

D. Polyline

What is the correct answer?

4

When creating a Cutting Plane line with Auto-CAD it is customary to use a ________ to create the line.

A. Center line

B. Polyline

C. Dashed line

D. Hatch line

What is the correct answer?

4

These are used to attach parts to a cylinder so they won't turn on it:

A. Lugs and bearings

B. Key-seats and bearings

C. Knurls and keys

D. Keys and keyways/key-seats

What is the correct answer?

4

This is the term for the range of tightness or looseness resulting from the allowances and tolerances in mating parts:

A. Limits

B. Fit

C. Specifications

D. Allowance

What is the correct answer?

4

The type of line that projects from an object for the express purpose of locating a dimension is a ________ line.

A. Visible

B. Hidden

C. Extension

D. Dimension

What is the correct answer?

4

Elevation drawings will include information about ________.

A. Roof pitch

B. Siding

C. Window style

D. All of the above

What is the correct answer?

4

The maximum and minimum sizes of a feature are identified by a ________ tolerance.

A. Limits

B. GD&T

C. Reference

D. Allowance

What is the correct answer?

4

The second line of dimensions out from the plan generally includes ________.

A. Centers of doors and windows

B. The distances between outside walls and interior walls

C. The measurement from the outside of the brick to the inside of the exterior wall

D. The measurement from one outside corner to the opposite outside corner

What is the correct answer?

4

In U.S. structural and architectural drafting, all dimensions of this length are usually expressed in feet and inches:

A. One inch or over

B. One foot or over

C. One yard or over

D. One rod or over

What is the correct answer?

4

This type of thread is a thread on the inside of a member:

A. Basic thread

B. External thread

C. Internal thread

D. Major diameter thread

What is the correct answer?

4

Understanding the Cartesian coordinate system will help the beginning drafter ________.

A. Control the accuracy of the drawing

B. Produce a visible grid system

C. Select a different text style

D. Choose various line types

What is the correct answer?

4

A fillet is a rounded surface on the ________ corner of a part.

A. Inside

B. Outside

C. Radial

D. Isoplane

What is the correct answer?

4

An Auto-CAD term that refers to a pre-drawn object which is stored in a drawing file and can be inserted into any other drawing file as needed is a ________.

A. Block

B. Brick

C. Balloon

D. None of the above

What is the correct answer?

4

These are lines drawn on a map to locate, in the plan view, points of equal ground elevation:

A. Contours

B. Elevations

C. Profiles

D. Hatches

What is the correct answer?

4

The title block used on working drawings should include the __________.

A. Sheet number

B. Line type

C. Layer set

D. All of the above

What is the correct answer?

4

In this type of section, one quarter of the object is removed:

A. Revolved section

B. Removed section

C. Quarter section

D. Half section

What is the correct answer?

4

Some common blocks used by architectural drafters include ________.

A. Door swings

B. Ceiling fans

C. Appliances

D. All of the above

What is the correct answer?

4

This type of structural steel drawing shows all dimensions necessary for fabrication:

A. Shop drawings

B. Design drawings

C. Weldment drawings

D. Application drawings

What is the correct answer?

4

In order to convert fractional inches into decimal inches ________.

A. Look on a metric conversion chart

B. Divide the numerator (top number) by the denominator (bottom number)

C. Check the engineer's scale

D. All of the above