Large project
Major work
Minor work
All of these
C. Minor work
Quality
Statistics
Probability
All of the above
Process chart
Machine load chart
Man-machine chart
Gantt chart
Normal
Binomial
Beta
Exponential
Short run analysis
Long run analysis
Average of above two run analysis
There is no such criterion
Batch production
Continuous type of product
Effective utilisation of machines
All of the above
Producing more with increased inputs
Producing more with the same inputs
Eliminating idle time
Minimising resource waste
Immediately on joining the service
After 60 days of joining the service
After 100 days of joining the service
After 240 days of joining the service
Standard time
Normal time
Representative time
None of these
Dispatch of sales order
Dispatch of factory mail
Dispatch of finished product of the user
Dispatch of work orders through shop floor
Value analysis
Network analysis
Linear programming
Queuing theory
Optimistic time
Pessimistic time
Most likely time
All of the above
A circle
A straight line
An arrow
None of these
PERT deals with events and CPM with activities
Critical path is determined in PERT only
Costs are considered on CPM only and not in PERT
Guessed times are used in PERT and evaluated times in CPM
Combined Process Method
Critical Path Method
Common Planning Method
Critical Process Method
Adequate incentive
Ease of administration
Guaranteed basic pay
All of these
Normal time
Slow time
Crash time
Standard time
2 HA
1.33 HA
1.5 HA
1.15 HA
Stock control system
To run the stores effectively
Technical responsibility for the state of materials
All of the above
Determining the most efficient method of performing a job
Establishing the minimum time of completion of a job
Developing the standard method and standard time of a job
Economising the motions involved on the part of the worker while performing a job
Whose output exceeds 67% efficiency
On the percentage of time saved
On the percentage of time worked
On the percentage of standard time
Purchase value
Saleable value
Depreciated value
Function/cost
Analyse material handling
Determine inventory control difficulties
Plan material handling procedure and routes
All of the above
CPA (Critical Path Analysis)
CPP (Critical Path Plotted)
CPS (Critical Path Scheduling)
All of the above
Standardisation
Better process planning
Bonus plan
Better product planning
Find the depreciation value of a machine
Determine the selling price of a product
Minimise the cost without change in quality of the product
All of the above
Gantt chart
Flow chart
Breakeven chart
PERT chart
Latest allowable time and the normal expected time
Latest allowable time and the earliest expected time
Proposed allowable time and the earliest expected time
Normal allowable time and the latest expected time
Primary cost
Factory cost
Factory expenses
Primary cost + factory expenses
Prescribes the sequence of operations to be followed
Determines the programme for the operations
Is concerned with the starting of processes
Regulates the progress of job through various processes
Minimum value
Maximum value
Average value
Alarming value