Related Questions
What is the correct answer?
4
A circular arc is dimensioned in the view where you see its true shape by giving the value for its:
What is the correct answer?
4
EDM is the acronym for:
A. Enterprise data management
B. Engineering drawing management
C. Enterprise drawing manipulation
D. Engineering data manipulation
What is the correct answer?
4
This is used in applications for nonferrous construction:
What is the correct answer?
4
These breaks are used to shorten the view of an object:
What is the correct answer?
4
A civil engineer working on a bridge design would probably rely on his ________ scale for checking printed drawings.
What is the correct answer?
4
The condition of a part when it contains the least amount of material is referred to as ________.
What is the correct answer?
4
In order to create an accurate assembly drawing the drafter should create the ________ drawings first.
What is the correct answer?
4
This type of section is limited by a break line:
What is the correct answer?
4
This line pattern is composed of three dashes, one long dash on each end with a short dash in the middle:
What is the correct answer?
4
The bounding box method for setting up an isometric drawing helps the drafter ________.
A. Confine the isometric drawing to its maximum size
B. Figure what lines are to be illustrated vertical and horizontal
C. Position the isometric drawing in paper space
What is the correct answer?
4
Some common blocks used by architectural drafters include ________.
What is the correct answer?
4
An accurate record of changes made to release drawings is tracked via this:
What is the correct answer?
4
This is the theoretically exact size from which limits of size are determined:
What is the correct answer?
4
A half-moon protractor is divided into how many degrees?
What is the correct answer?
4
Given a situation in which the drafter has crossed extension lines in a drawing what can be done to clean up the point of crossing?
A. Use the Modify tool to clean up the extension lines
B. Use the Tolerance tool to clean up the extension lines
C. Use the Break tool to clean up the extension lines
D. Use the stretch tool to clean up the extension lines
What is the correct answer?
4
These weld symbols have no arrow-side or other-side significance:
A. Projection or seam weld
C. Surface or groove weld
What is the correct answer?
4
When the drafter types the word BLOCK or selects the Make Block tool from the Draw tool bar the ________ will appear.
C. Block Definition Dialog
What is the correct answer?
4
Understanding the Cartesian coordinate system will help the beginning drafter ________.
A. Control the accuracy of the drawing
B. Produce a visible grid system
C. Select a different text style
D. Choose various line types
What is the correct answer?
4
The type of line that projects from an object for the express purpose of locating a dimension is a ________ line.
What is the correct answer?
4
Welding drawings are a special type of this kind of drawing:
What is the correct answer?
4
The site plan illustrates ________.
B. Where the house sits on the property
D. Where the garage and driveway are located
What is the correct answer?
4
In oblique projection, important shapes should be in this position relative to the viewing plane:
What is the correct answer?
4
The standard number of threads per inch for various diameters is the:
What is the correct answer?
4
In working drawings, these show all necessary information not given directly on the drawing with its dimensions and notes:
D. Title and record strips
What is the correct answer?
4
The primary unit of measurement for engineering drawings and design in the mechanical industries is the:
What is the correct answer?
4
These types of projectors converge at a vanishing point:
What is the correct answer?
4
Some of the standard Auto-CAD text styles used in architectural drawings includes ________.
What is the correct answer?
4
A projection weld is a type of:
What is the correct answer?
4
This is the measured size of a finished part:
What is the correct answer?
4
The architectural and construction industries use the United States National CAD standard (NCS) system on many ________ projects.