Basic motion time study gives times for basic motions in ten thousandths of

A. Second

B. Minute

C. Hour

D. Day

Please do not use chat terms. Example: avoid using "grt" instead of "great".

You can do it
  1. Abbreviated work factor data is applied for
  2. The determination of standard time in a complex job system is best done through
  3. If TL is the largest allowable event occurrence time, total activity slack (s) is equal to
  4. The linear programming techniques can be applied successfully to industries like
  5. Which one of the following techniques is used for determining allowances in time study?
  6. Job evaluation is the method of determining the
  7. The value engineering technique in which experts of the same rank assemble for product development is…
  8. Routing assists engineers in deciding in advance
  9. Which of the following is not wage incentive plan?
  10. Which one of the following represents a group incentive plan?
  11. The most popular type of organisation used for Civil Engineering Constructions is
  12. In the Halsey system of wage incentive plan, a worker is
  13. Gantt chart is used for
  14. Indirect expenses include
  15. The time by which the activity completion time can be delayed without affecting the start of succeeding…
  16. According to Muther, the basic principle of best layout is
  17. The salient feature of functional organisation is
  18. Standard time as compared to normal time is
  19. Current assets include
  20. Break-even analysis can be used for
  21. Valve analysis is particularly of interest when
  22. The production scheduling is simpler and high volume of output and high labour efficiency are achieved…
  23. An activity of the project is graphically represented by ________ on the network diagram.
  24. In the Halsey 50-50 plan, the following are rewarded more
  25. Work study is done with the help of
  26. Break-even analysis shows profit when
  27. A systematic job improvement sequence will consist of
  28. When slack of an activity is positive
  29. In order that linear programming techniques provide valid results
  30. PERT has following time estimate