Home
Current Affairs January 2024

What is the correct answer?

4

Choose the correct option in terms of Issues related to professional responsibility

A. Confidentiality

B. Intellectual property rights

C. Managing Client Relationships

D. Both a & b

Correct Answer :

D. Both a & b


Related Questions

What is the correct answer?

4

What types of errors are missed by black-box testing and can be found by white-box testing?

A. Behavioural error

B. Logic errors

C. Performance error

D. Interface error

What is the correct answer?

4

The SOFL model of Liu and colleagues (1997) presents an integrated approach that adopts _____ methodologies in the requirements phases and _____ methodologies in the design and implementation phases

A. Procedure-oriented, Structured

B. Structured, Procedure-oriented

C. Structured, Object-oriented

D. Object-oriented, Structured

What is the correct answer?

4

Which of the following is not the strategy for achieving reliability in software system?

A. Fault avoidance

B. Fault tolerance

C. Fault detection

D. Fault repair

What is the correct answer?

4

State True or False.
1. People are at the core of problem solving because business problems are solved by people for people.
2. The structure of the group and its efficiency of communications, style of management, and cohesiveness are critical factors in the effectiveness of the team.

A. 1-True, 2-True

B. 1-True, 2-False

C. 1-False, 2-True

D. 1-False, 2-False

What is the correct answer?

4

What is meant by the term software crisis?

A. Ability to deliver software on time with good quality

B. A situation in which experienced developers leave the company

C. Inability of new software to inter-operate with existing software

D. Instability in the development team

What is the correct answer?

4

Which of the following are the activities of the function- oriented design.

A. Data- flow design

B. Structural decomposition

C. Detailed design description

D. All the above

What is the correct answer?

4

Which of the following is a the process metric which is useful for assessing maintainability?

A. Number of request for corrective maintenance

B. Average time required for impact analysis

C. All the above

D. Number of oustanding change request

What is the correct answer?

4

State True or False.
1. People have different software needs that change over time.
2. Most computer users do not understand computer languages.

A. 1-False, 2-False

B. 1-True, 2-False

C. 1-False, 2-True

D. 1-True, 2-True

What is the correct answer?

4

The Linear sequential model is also known as ________.

A. classical life cycle model

B. Fountain model

C. Spiral model

D. Concurrent model

What is the correct answer?

4

The economic success of an application is measured in terms of metrics such as _____.

A. Profit maximization

B. Cost reduction

C. Customer satisfaction

D. All of the above

What is the correct answer?

4

Which of the following the notation is not used to represent an object class in an object model?

A. Class Name

B. Entity

C. Attributes

D. Service

What is the correct answer?

4

Tools used in the early phases of the life cycle are called _____ CASE tools.

A. Lower

B. Back-end

C. Intermediate

D. Upper

What is the correct answer?

4

State True or False.
1. Cultural differences are examples of inherited characteristics that affect the degree of diversification in an environment.
2. Amid various diversity, commonly shared human needs play a unifying role.

A. 1-False, 2-False

B. 1-True, 2-False

C. 1-False, 2-True

D. 1-True, 2-True

What is the correct answer?

4

Which of the following is not aspects to fault tolerance.?

A. Failure detection

B. Damage assessment

C. Fault avoidance

D. Fault repair

What is the correct answer?

4

Data structure suitable for an application discussed in?

A. interface design

B. data design

C. procedural design

D. architectural design

What is the correct answer?

4

Which of the following notation in data flow diagram is used to represent user interaction with system?

A. Arrow Head

B. Rectangle

C. Rounded Rectangle

D. Circle

What is the correct answer?

4

State True or False.
1. COCOMO is not a cost estimation model.
2. Human factors have an important role in the development process.

A. 1-True, 2-True

B. 1-True, 2-False

C. 1-False, 2-True

D. 1-False, 2-False

What is the correct answer?

4

Design phase will usually be?

A. bottom-up

B. random

C. top-down

D. center fingring

What is the correct answer?

4

Which of the following is a technical factor which affect software maintenance cost?

A. Application Domain

B. Staff stability

C. Programming language

D. External environment

What is the correct answer?

4

Identify the correct statement: Software engineers shall

A. ensure that their products only meet the SRS.

B. act consistently with the public interest.

C. act in a manner that is in the best interests of his expertise and favour.

D. none

What is the correct answer?

4

ISO stands for _____.

A. Indian Statistical Organization

B. Inter State Organization

C. International Standards Organization

D. Indian Standards Organization

What is the correct answer?

4

The major advantage of bottom-up integration testing is__________.

A. major decision points are tested early

B. no drivers need to be written

C. no stubs need to be written

D. regression testing is not required

What is the correct answer?

4

State True or False.
1. 4GLs are not CASE tools.
2. The domain of applicability of CASE tools are much more limited than the 4GL.

A. 1-True, 2-True

B. 1-True, 2-False

C. 1-False, 2-True

D. 1-False, 2-False

What is the correct answer?

4

Which of the following is a tool in design phase?

A. abstraction

B. refinement

C. information hiding

D. all of above three

What is the correct answer?

4

Information hiding is to hide from user details

A. that are not relevant to him

B. that re relevant to him

C. that may be maliciously handled by him

D. that are confidential

What is the correct answer?

4

Efficiency in a software product does not include ________

A. licensing

B. responsiveness

C. processing time

D. memory utilization

What is the correct answer?

4

State True or False.
1. Investors and owners are also significant stakeholders who make demands on a system in terms of financial goals.
2. Experts and consultants are another stakeholder class who can strongly affect problem definition.

A. 1-False, 2-False

B. 1-True, 2-False

C. 1-False, 2-True

D. 1-True, 2-True

What is the correct answer?

4

_____ interoperate with systems at a mobile or remote level in order to access inventory, check prices, and close deals.

A. System Operator

B. Salesman

C. Database Manager

D. Accountant

What is the correct answer?

4

The spiral model of software development___________

A. A useful approach when a customer cannot define requirements clearly.

B. Is more chaotic than the incremental model

C. Includes project risks evaluation during each iteration

D. Often used for the development of client/server applications

What is the correct answer?

4

A good specification should be?

A. distinctly specific

B. unambiguous

C. all of these

D. functional