Critical path method

A. Helps in ascertaining time schedules

B. Makes better and detailed planning possible

C. Provides a standard method for communicating project plans schedules and to time and cost performance

D. All of the above

Please do not use chat terms. Example: avoid using "grt" instead of "great".

You can do it
  1. In the cost structure of a product, the selling price is determined by the factors such as
  2. In CPM, the cost slope is determined by
  3. Queueing theory is used for
  4. Graphical method, simplex method, and transportation method are concerned with
  5. Breakeven analysis is a
  6. Dispatching
  7. In order to avoid excessive multiplication of facilities, the layout preferred is
  8. CPM has following time estimate
  9. Which of the following is not wage incentive plan?
  10. A-B-C analysis
  11. In jobbing production
  12. Routing prescribes the
  13. Break-even analysis can be used for
  14. The salient feature of functional organisation is
  15. An optimum project schedule implies
  16. The technique of value analysis can be applied to
  17. In A-B-C analysis, which class of items are generally large in number?
  18. In time study, the rating factor is applied to determine
  19. F. W. Taylor introduced a system of organisation known as
  20. Scheduling gives information about
  21. In perpetual inventory control, the material is checked as it reaches its
  22. The most important function of inventory control is
  23. If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual…
  24. In the Emerson efficiency plan, a worker receives only his daily wage and no bonus is paid till his…
  25. Queueing theory deals with problems of
  26. The allowed time for a job equals standard time plus
  27. For a small scale industry, the fixed cost per month is Rs. 5000. The variable cost per product is Rs.…
  28. Which of the following depreciation system ensures that the interest be charged on the cost of machine…
  29. Critical path moves along the activities having total float of
  30. The process layout is best suited where