For handling materials during manufacture of cement, a _________ is widely used.

A. Belt conveyor

B. Bucket conveyor

C. Fork lift truck

D. Overhead crane

Please do not use chat terms. Example: avoid using "grt" instead of "great".

You can do it
  1. CPM requires
  2. Choose the wrong statement. Motion study is used for
  3. The artificial activity, which indicates that an activity following it cannot be started unless, the…
  4. Which of the following conditions are necessary for applying linear programming?
  5. 'Value' for value engineering and analysis purposes is defined as
  6. PERT analysis is based on
  7. Pick up the correct statement from the following
  8. Which one of the following represents a group incentive plan?
  9. What does symbol 'O' imply in work study?
  10. Choose the wrong statement Time study is used to
  11. The term 'value' in value engineering refers to
  12. The work study is done by means of
  13. Graphical method, simplex method, and transportation method are concerned with
  14. Earliest finish time can be regarded as
  15. The basic difference between PERT and CPM is that
  16. The procedure of modifying work content to give more meaning and enjoyment to the job by involving employees…
  17. Which of the following is not wage incentive plan?
  18. The bonus increases in proportion to the increase in efficiency. This statement applies to
  19. In Lincoln plan (one type of group incentive plan), the amount of the profit which an employee receives…
  20. In CPM, the cost slope is determined by
  21. Which of the following statement is correct?
  22. Time study is carried out
  23. Acceptance sampling is widely used in
  24. The breakeven point represents
  25. The value engineering technique in which experts of the same rank assemble for product development is…
  26. Which of the following wage incentive plan guarantees minimum wage to a worker and bonus is paid for…
  27. The objective of time study is to determine the time required to complete a job by
  28. In process layout
  29. Actual performance of a task is called
  30. In break even analysis, total cost consists of