Loads are uniform
Routes do not vary
Materials move relatively continuously
All of these
D. All of these
Job production
Batch production
Mass production
Any one of these
Single time estimate
Double time estimate
Triple time estimate
None of these
EF = ES + D
LS = LFD
LF = LS + D
All of the above
M.T.M. (Method Time Measurement)
W.F.S. (Work Factor Systems)
B.M.T.S. (Basic Motion Time Study)
All of these
Producing more with increased inputs
Producing more with the same inputs
Eliminating idle time
Minimising resource waste
A straight line
A number enclosed in a circle or a square
A straight line with circles at the ends
A dotted line
Normal
Binomial
Beta
Exponential
Sales revenue > total cost
Sales revenue = total cost
Sales revenue < total cost
Variable cost < fixed cost
Maximum slack
Minimum slack
Zero slack
Average slack
Halsey plan
Gantt plan
Emerson's efficiency plan
Rowan plan
Ordering procedure
Forecasting sales
Production planning
Despatching and expediting
Is represented by a dotted line
Is an artificial activity
Does not consume time or resources
All of these
Effective command and control
Defined responsibilities at all levels
Rigid discipline in the organisation
All of the above
Determine the critical path
Determine the project completion time
Maintain the required net work
None of these
Process chart
Material handling
Stop watch
All of the above
One type of product is produced
Product is standardised
Product is manufactured in large quantities
All of the above
Planning chart
Process chart
Stop watch
Any one of these
A
B
C
None of these
Consumes time, but no resources
Consumes resources but no time
Consumes neither time nor resources
Is a dangling event
Event
Free float
Artificial
Dummy
Detailed calculations
Convenience
Table of random numbers
Past experience
Lowers overall manufacturing time
Requires less space for placing machines
Utilises machine and labour better
All of these
Once through project
Maintenance jobs
Research and development
All of the above
0.0001 minute
0.0006 minute
0.006 minute
0.001 minute
Primary cost
Factory cost
Factory expenses
Primary cost + factory expenses
Effective running of stores
State of merchandise methods of storing and maintenance etc.
Stock control system
All of the above
Flow chart
Process chart
Travel chart
Operation chart
The flow of material in the plant
The methods of proper utilization of manpower
The methods of proper utilization of machines
The layout of factory facilities
Greater
Smaller
Equal
There is no such correlation
Creative phase, information phase, investigation phase, evaluation phase
Information phase, creative phase, investigation phase, evaluation phase
Investigation phase, information phase, creative phase, evaluation phase
Creative phase, investigation phase, evaluation phase, information phase