A person
A firm
An agency
All the above
D. All the above
An analytic in concept
Limited of event oriented diagrams
Used for research and development projects
All the above
Rs. 8,43,750
Rs. 8,75,000
Rs. 10,50,000
Rs. 11,56,250
Number of operations
Output of labour
Output of machinery
All the above
Preparation of estimate
Survey of the site
Initiation of proposal
Preparation of tender
Greater than earliest event time of the following node
Less than earliest event time of the following node
Less than or equal to earliest event time of the following node
Greater than or equal to earliest event time of the following node
The various functions under each activity, are shown by one bar on Bar Charts
Bar chart establishes the interdependency of one event on another
Only approximate percentage of the completed work is reported
None of these
LST-EST
LFT-EFT
TL-EFT
All the above
Preparation of specifications
Preparation of estimates
Initiating the procurement action of resources
All the above
Activity of an excavation of a footing
Activity of an excavation which starts at event No. 1 and ends at even No. 2
Activity of excavation which takes 8 units of time
None of these
Minor works
Major works
Large projects
All the Above
Programme Evaluation and Review Technique, is event oriented
Programme Evaluation and Review Technique is not event oriented
Critical Path Method is event oriented
Critical Path method is event oriented
(ii), (iii) and (iv) are correct
(i), (ii) and (iv) are correct
(i), (iii) and (iv) are correct
(i) and (iv) are correct
Crash time
Normal time
Optimistic time
Between normal time and crash time
Trimming and finishing
Shaping and trimming
Finishing and shaping
Finishing, shaping and trimming
3425 kg
5515 kg
4350 kg
2975 kg
Departmental representative or user
Local civil authority representative
Representative of engineer authority
All the above
Optimistic time estimate refers to activities
Pessimistic time estimate refers to activities
Most likely time estimate refers to activities
All the above
Is always longest
Is always shortest
May be longest
May be shortest
1 and 4 are correct
2 and 3 are correct
1 and 4 are correct
1 and 2 are correct
Total float
Free float
Interfering float
Independent float
The difference of latest occurrence time and earliest expected time, is called slack
The activities connecting the events having zero slack, lie on the critical path
The critical path consumes the maximum time
All the above
Increase in rates of only important materials
Variation in cost in materials element, labour element and petrol-oillubricant element
Variation in total cost of the project on an ad hoc basis
Rate of inflation
1-2 is 4
2-3 is 7
3-4 is 8
All the above
20 kg/tonne
30 kg/tonne
40 kg/tonne
50 kg/tonne
1, 2, 4, 3, 5
1, 3, 2, 4, 5
1, 2, 3, 4, 5
1, 3, 4, 2, 5
Rs. 31050
Rs. 34500
Rs. 37950
Rs. 50000
(a + m + b)/6
(a + 2m + b)/6
(a + 4m + b)/6
(a + 5m + b)/6
Determines the status of each activity
Adjusts automatically changes in activity progress
Is a dynamic system
None of these
The activity is the time consuming part of a project
The beginning and end of a job, are called events
The activity which consumes maximum time, is called a node
Logically and sequentially connected activities and events form a network
(t1 - t2) - t
t - (t1 - t2)
(t1 + t2) - t
t + (t1 - t2)