Home
Current Affairs January 2024

What is the correct answer?

4

How can the drafter prevent Auto-CAD from placing or stacking another center mark on a circle when adding a diameter dimension to it?

A. Explode the dimension and then erase the center mark

B. Use the Properties dialog box to turn off the center mark of the dimension

C. It can't be done

D. Use the trim tool to take away the stacked center mark

Correct Answer :

B. Use the Properties dialog box to turn off the center mark of the dimension


Related Questions

What is the correct answer?

4

This type of thread is a thread on the inside of a member:

A. Basic thread

B. External thread

C. Internal thread

D. Major diameter thread

What is the correct answer?

4

In this type of drawing, vertical pipes may be revolved into the horizontal plane:

A. Standard view

B. Elevation view

C. Transverse piping

D. Developed piping

What is the correct answer?

4

In isometric projection, all distances are approximately this percentage of their true size:

A. 120 percent

B. 80 percent

C. 50 percent

D. 20 percent

What is the correct answer?

4

In order to set drawing limits for a C size architectural drawing the drafter should set the limits to ________.

A. 0, 0 and 2, 9

B. 0, 0 and 17, 11

C. 0, 0 and 18, 24

D. 0, 0 and 34, 24

What is the correct answer?

4

A ________ section allows the drafter to create a Cutting Plane line which is not in a straight line across the part.

A. Offset

B. Half

C. Whole

D. Broken out

What is the correct answer?

4

In some circumstances an entire drawing can be inserted into a different drawing as a block. When this is used the base point will default to ________.

A. 0, 0

B. 10, 10

C. 20, 20

D. 30, 30

What is the correct answer?

4

A ________ is the person responsible for verifying that the drawings in a project set are free of mistakes.

A. Client

B. CAD trainee

C. Receptionist

D. Checker

What is the correct answer?

4

When drawing a line using the relative coordinate system a line is created from ________.

A. 0, 0

B. The ending point of the last line

C. The beginning point of the last line

D. None of the above

What is the correct answer?

4

If a plane is parallel to the plane of projection, it appears:

A. True size

B. As a line or edge

C. Foreshortened

D. As an oblique surface

What is the correct answer?

4

The section view drawing in which one fourth of an object has been marked for removal is known as a ________ section.

A. Full

B. Half

C. Quarter

D. None of the above

What is the correct answer?

4

The type of line that projects from an object for the express purpose of locating a dimension is a ________ line.

A. Visible

B. Hidden

C. Extension

D. Dimension

What is the correct answer?

4

When using versions of Auto-CAD prior to Release 2006 it may be necessary to ________ a block in order to edit it.

A. Copy

B. Explode

C. Offset

D. None of the above

What is the correct answer?

4

In multi-view drawing it is common practice to include three views, the front, the top and the right side. If no dimensions are required on the right side view the drafter can ________.

A. Leave the view as is

B. Eliminate the view

C. Use the left view instead

D. None of the above

What is the correct answer?

4

This type of section is limited by a break line:

A. Removed section

B. Revolved section

C. Broken-out section

D. Half section

What is the correct answer?

4

These breaks are used to shorten the view of an object:

A. Section breaks

B. Aligned breaks

C. Conventional breaks

D. Full breaks

What is the correct answer?

4

In this type of view, the cutting plane line indicates both the location of the cutting plane and the direction of sight:

A. Removed section

B. Revolved section

C. Auxiliary section

D. Partial section

What is the correct answer?

4

In these drawings it is necessary to show cut surfaces and distinguish between adjacent parts:

A. Auxiliary drawings

B. Assembly sections

C. 3D assemblies

D. Parts lists

What is the correct answer?

4

In U.S. structural and architectural drafting, all dimensions of this length are usually expressed in feet and inches:

A. One inch or over

B. One foot or over

C. One yard or over

D. One rod or over

What is the correct answer?

4

These drawings are given to contractors to perform work or manufacture individual parts:

A. Assembly details

B. 3D drawings

C. Working drawings

D. Skeleton assemblies

What is the correct answer?

4

The ________ is a standard element of a section view in a technical drawing.

A. Cutting Plane line

B. Section lines

C. Material hatch pattern

D. All of the above

What is the correct answer?

4

When using the direct entry method to create a horizontal line exactly three inches long the drafter should ________ first.

A. Pull the line from away from the starting point very carefully

B. Insure that Ortho is on

C. Enter 3 for the length of the line

D. Read the coordinate position on the Dynamic Readout

What is the correct answer?

4

The maximum and minimum sizes of a feature are identified by a ________ tolerance.

A. Limits

B. GD&T

C. Reference

D. Allowance

What is the correct answer?

4

The architectural and construction industries use the United States National CAD standard (NCS) system on many ________ projects.

A. Residential

B. Commercial

C. Aerospace

D. Publicly funded

What is the correct answer?

4

The organized and orderly approach to solving problems is known as the:

A. Engineering process

B. Design process

C. Aesthetic process

D. Functional process

What is the correct answer?

4

The Free Orbit tool is found on the ________ toolbar.

A. Rotate

B. Move

C. Modify

D. 3-D Move

What is the correct answer?

4

This is a flat or rounded tab protruding from a surface, usually to provide a method for attachment:

A. Lug

B. Boss

C. Chamfer

D. Spotface

What is the correct answer?

4

When creating a Cutting Plane line with Auto-CAD it is customary to use a ________ to create the line.

A. Center line

B. Polyline

C. Dashed line

D. Hatch line

What is the correct answer?

4

In this type of concrete, the steel is pre-tensioned before the superimposed load is applied:

A. Aggregate

B. Pre-stressed

C. Reinforced

D. Preloaded

What is the correct answer?

4

The title block used on working drawings should include the __________.

A. Sheet number

B. Line type

C. Layer set

D. All of the above

What is the correct answer?

4

An accurate record of changes made to release drawings is tracked via this:

A. A revision block

B. The basic title form

C. Working drawings

D. Portable documents