10 cm
15 cm
20 cm
25 cm
C. 20 cm
l/3
l/5
l/7
l/10
Between 150 to 300 kg/cm2
Between 350 to 600 kg/cm2
Between 150 to 500 kg/cm2
Below 200 kg/cm2
10 cm
15 cm
20 cm
25 cm
100 mm
150 mm
200 mm
250 mm
Magnesium oxide
Iron oxide
Alumina
Lime
The degree of grinding of cement, is called fineness
The process of changing cement paste into hard mass, is known as setting of cement
The phenomenon by virtue of which cement does not allow transmission of sound, is known as soundness of cement
The heat generated during chemical reaction of cement with water, is known as heat of hydration
Higher compressive strength of concrete
Lower compressive strength of concrete
Higher tensile strength of steel
Lower tensile strength of steel
2.0 to 3.5
3.5 to 5.0
5.0 to 7.0
6.0 to 8.5
5 days
7 days
10 days
14 days
Calcium chloride acts as a retarder
Calcium chloride acts as an accelerator
Gypsum (calcium sulphate) acts as a retarder
Both (b) and (c)
20 kN/cm²
200 kN/cm²
200 kN/mm²
2 × 106 N/cm²
30 minutes
40 minutes
60 minutes
90 minutes
Only (ii) is correct
(i) and (ii) are correct
(iii) and (iv) are correct
Only (iv) is correct
3.5 m
4 m
4.5 m
5 m
5% by weight of aggregates plus 20% of weight of cement
10% by weight of aggregates plus 10% of weight of cement
5% by weight of aggregates plus 30% of weight of cement
30% by weight of aggregates plus 10% of weight of cement
Shear strength
Tensile strength
Compressive strength
None of these
The least lateral dimension of the member
Sixteen times the smallest diameter of longitudinal reinforcement bar to be tied
Forty-eight times the diameter of transverse reinforcement
Lesser of the above three values
Time of transit
Water-cement ratio
The air in the mix
Size of aggregate
Setting time
Tensile strength
Consistency
All the above
2/3 mean dimension
3/4 mean dimension
3/5 mean dimension
5/8 mean dimension
At the middle of the wall
At the edge of the wall
Halfway between the middle and edge of the wall
At a distance equal to effective depth of footing from the edge of the wall
1 : 1 : 2
1 : 2 : 4
1 : 3 : 6
1 : 4 : 10
Front face only
Inner face only
Both front face and inner face
None of the above
0.43 d
0.55 d
0.68 d
0.85 d
Less
More
Equal
None of the above
Higher Vee-Bee time shows lower workability
Higher slump shows higher workability
Higher compacting factor shows higher workability
None of the above
5 % less
10 % less
5 % more
10 % more
Compressive stress
Shear stress
Bond stress
Tensile stress
Tonnes/cubic metre
kg/cubic metre
kg/litre
g/cm3
Lean mixes bleed more as compared to rich ones.
Bleeding can be minimized by adding pozzolana finer aggregate
Bleeding can be increased by addition 'of calcium chloride
None of the above