Highly skilled workers are needed
Unit costs are high
Operations are labour-intensive
All of these
D. All of these
EF = ES + D
LS = LFD
LF = LS + D
All of the above
Determine standard costs
Determine the number of machines a person may run
Provide a basis for setting piece price or incentive wages
All of the above
Complicated items only
Simple items only
Crash programmer items only
Any item
Strict adherence to specification
Separation of planning and design part
Each individual maintains functional efficiency
All of the above
Fixed cost + sales revenue
Variable cost + sales revenue
Fixed cost + variable cost
Fixed cost + variable cost + profit
Normal
Binomial
Beta
Exponential
Halsey plan
Gantt plan
Emerson's efficiency plan
Rowan plan
All industries
All process industries and thermal power plants
Only major industries
All industries employing more than 100 workers
Hoist
Jib crane
Portable elevator
Chain conveyor
Motion study
Time study
Job enrichment
All of these
Permits a fine breakdown of activities and delays
Simultaneous study of many operators may be made by a single observer
Calculations are easier, method is economical and less time consuming
No time measuring devices are generally needed
0.50
0.66
0.84
0.95
Greater
Smaller
Equal
There is no such correlation
Effective command and control
Defined responsibilities at all levels
Rigid discipline in the organisation
All of the above
CAM < DAM
CAM > DAM
CAM = DAM
There is no such criterion
Depreciation value of a product
Resale value of a product
Major function of the item and accomplishing the same at least cost without change in quality
Breakeven point when machine requires change
When work should start and how much work should be completed during a certain period
When work should complete
That how idle time can be minimized
Proper utilisation of machines
Achieving optimisation
Ensuring against market fluctuations
Acceptable customer service at low capital investment in inventory
Discounts allowed in bulk purchase
(F × V)/P
(F × P)/V
F/[1 + (V/P)]
F/[1 - (V/P)]
Effective running of stores
State of merchandise methods of storing and maintenance etc.
Stock control system
All of the above
TR
TR + [(S - T)/2] × R
TR + (S - T) × R
TR + [(S - T)/S] × R
Quality
Statistics
Probability
All of the above
A straight line
A number enclosed in a circle or a square
A straight line with circles at the ends
A dotted line
That can't be analysed mathematically
Involving multistage queuing
To verify mathematical results
All of the above
Improving present method and finding standard time
Motivation of workers
Improving production capability
Improving production planning and control
Optimistic time
Pessimistic time
Most likely time
All of the above
(Normal time) - (allowances)
(Normal time) + (allowances)
Representative time multiplied by rating factor
Normal time taken by an operation
50 %
66.67 %
75 %
80 %
An event
An activity
A duration
None of these
Conveyors
Cranes and hoists
Trucks
Locos