Sales turn over
Lowest competitive price
Various elements of the cost
All of the above
D. All of the above
Shows the inter dependences of various jobs
Depicts the delay of jobs, if any
Points outgoing ahead of schedule of jobs, if any
None of the above
50 %
66.67 %
75 %
80 %
The appraisal, in terms of time, of the value of work involving human effort
Machine setting time
Time taken by workers to do a job
Method of fixing time for workers
All industries
All process industries and thermal power plants
Only major industries
All industries employing more than 100 workers
Overhead crane
Trolley
Belt conveyor
All of the above
Determining the most efficient method of performing a job
Establishing the minimum time of completion of a job
Developing the standard method and standard time of a job
Economising the motions involved on the part of the worker while performing a job
Process chart
Material handling
Stop watch
All of the above
A differential piece rate system should exist
Minimum wages should be guaranteed
Provide incentive to group efficiency performance
All standards should be based on time studies
Breakeven analysis
Value analysis
Linear programming
Queueing theory
Halsey plan
Gantt plan
Rowan plan
Emerson's efficiency plan
Standardisation
Better process planning
Bonus plan
Better product planning
Latest start time earliest start time
Latest finish time earliest finish time (EFT)
TLEFT
All of the above
Crash cost/Normal Cost
(Crash Cost - Normal cost)/ (Normal time - Crash time)
Normal Cost/Crash cost
(Normal cost - Crash cost)/ (Normal time - Crash time)
(to + tp + tn)/3
(to + 2tp + tn)/4
(to + 4tp + tn)/5
(to + tp + 4tn)/6
Improving a work method
Improvising a work method
Designing a work method
Reducing inventory costs
Sales turn over
Lowest competitive price
Various elements of the cost
All of the above
An ordinary event
A significant event representing some milestone
An event to be transferred to other network chart
Dangling event
Event
Free float
Artificial
Dummy
Quality of work is better
Wastage of material is minimum
Specialised knowledge and guidance to individual worker is provided
All of the above
Batch production
Job production
Mass production
All of the above
The minimum time required for completion of project
The maximum time required for completion of project
Maximum cost required for completion of project
Minimum cost required for completion of project
Whose output exceeds 67% efficiency
On the percentage of time saved
On the percentage of time worked
On the percentage of standard time
Policy allowance
Interference allowance
Process allowance
Learning allowance
When work should start and how much work should be completed during a certain period
When work should complete
That how idle time can be minimized
Proper utilisation of machines
Second
Minute
Hour
Day
For checking the relative values of various layouts
When a group of workers are working at a place
Where processes require the operator to be moved from one place to another
All of the above
CPM
PERT
Inventory control
All of these
Motion study
Time study
Job enrichment
All of these
Organisation performance × motivation = profits
Knowledge × skill = ability
Ability × motivation = performance
Attitude × situation = motivation
Depreciation value of a product
Resale value of a product
Major function of the item and accomplishing the same at least cost without change in quality
Breakeven point when machine requires change