A tube of about 2 metres length and 20 cm diameter with a cutting edge
A flap valve at the bottom of tube is provided to extract the soil sample
The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand
All the above
D. All the above
Buttress
Leaf wall
Pilaster
Pillar
Very hard soil
Cemented soil
Vary soft soil
All the above
In dog-legged stairs, no space between its flights is provided
In open newel stair, a rectangular well is provided
In geometric stair, a curved shaped well between forward and backward flights, is provided
In geometrical stair, two quarter space landing is provided
Sedimentary rock
Metamorphic rock
Igneous rock
None of the above
Between ceiling and ground level
Between ceiling and floor level
Upto roof above ground level
Upto ceiling from the ground level
Bat
Header
Stretcher
Closer
Deodar and Shishum
Chir and sal
Sal and teak
Chir and deodar
Strap footing
Raft footing
Combined footing
Pier footing
Dubbing out
Floating
Knitting
Blistering
10 m
15 m
20 m
40 m
Isolated footing is provided under column to transfer the load safely to soil bed
Column footings may have steps or projections in the concrete base
Heavily loaded column base must be provided steel reinforcement in both directions
All the above
Water logged soils
Soft rocks
Compact soils
Multi-storeyed buildings
To drain off the water from the filling
To ventilate the stone masonry
To add architectural beauty
To increase compaction of the earth retained
Cracks appear on the plastered surface in the form of hair cracks
In brick work, the efflorescence is removed by applying a solution of zinc sulphate and water
Excessive thermal variations in the backing or plaster causes the plaster to fall
All the above
1, 2, 3, 4, 5
5, 4, 3, 2, 1
2, 1, 3, 5, 4
3, 2, 5, 1, 4
Baluster
Header
String
Beam
3.5 m or less
3.5 m but less than 5 m
5 m but less than 6.5 m
6.5 m but less than 8 m
3 day
7 days
14 days
21 days
Shoring
Underpinning
Jacking
Piling
Copper sheets
Lead sheets
Aluminium sheets
All the above
Cornice
Coping
Frieze
Lintel
At the centre of the base
Within the middle third of the base
Within the middle fifth of the base
Neither (a), (b) nor (c)
Looking through the well in the vicinity
Standing on the well in the vicinity
Measuring the depth of water in the well
None of the above
There is no horizontal tie beam
There is a horizontal tie at the feet of rafters only
There is a horizontal tie at almost the middle of rafters only
There are two horizontal ties, one at the feet and other at the middle of the rafters
Bed block
Perpend
Lintel
Vertical line
The pile driven in sand is called sand pile
The drilled hole filled with sand is called sand pile
The sand piles are used for bearing purposes
None of these
Draining sub-soil water
Ramming crushed stone in soil
Driving sand piles
Watering surface of soil
Retaining wall
Breast wall
Buttress
Parapet wall
Friction pile
Sheet pile
Batter pile
Anchor pile
Lack of ventilation
Alternate wet and dry conditions
Complete submergence in water
None of the above