Micro motion study is

A. Analysis of a man-work method by using a motion picture camera with a timing device in the field of view

B. Motion study observed on enhanced time intervals

C. Motion study of a sequence of operations conducted systematically

D. Study of man and machine conducted simultaneously

Please do not use chat terms. Example: avoid using "grt" instead of "great".

You can do it
  1. Pick up the correct statement from the following
  2. According to Rowan plan of wage incentive system, bonus is paid to a worker
  3. Work sampling is applied for
  4. What does symbol 'V' employ in work study
  5. In inventory control, the economic order quantity is the
  6. Queueing theory deals with problems of
  7. Process layout is also known as
  8. Service time in queuing theory is usually assumed to follow
  9. For material transportation, conveyors are used when the prevailing conditions include
  10. The most important function of inventory control is
  11. The two bin system is concerned with
  12. String diagram is used
  13. P.M.T.S. (Predetermined Motion Time Systems) include
  14. Which of the following depreciation system ensures that the interest be charged on the cost of machine…
  15. If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual…
  16. PERT is the
  17. PMTP (predetermined motion time systems) include
  18. Pick up the correct statement from the following
  19. The time required to complete a job is established and a bonus is paid to the worker based on the exact…
  20. In Lincoln plan (one type of group incentive plan), the amount of the profit which an employee receives…
  21. The linear programming techniques can be applied successfully to industries like
  22. Work study is most useful
  23. Percent idle time for men or machines is found by
  24. For handling materials during manufacture of cement, a _________ is widely used.
  25. Merit Rating is the method of determining worth of
  26. The time by which the activity completion time can be delayed without affecting the start of succeeding…
  27. Queuing theory is associated with
  28. Earliest finish time can be regarded as
  29. The first method invented for planning projects was
  30. In the Emerson efficiency plan, a worker receives only his daily wage and no bonus is paid till his…