Home
Current Affairs January 2024

What is the correct answer?

4

Most architectural firms and mechanical design companies utilize different categories of blocks. These sets of blocks are usually housed in ________.

A. Block vaults

B. Block libraries

C. Block books

D. Block references

Correct Answer :

B. Block libraries


Related Questions

What is the correct answer?

4

To avoid having to dimension to a hidden feature the drafter can utilize a ________ section.

A. Whole

B. Half

C. Broken out

D. All of the above

What is the correct answer?

4

The thread note for a typical bolt will include the ________.

A. Major diameter of the thread

B. Material

C. Center line

D. Offset distance

What is the correct answer?

4

The 3-D commands on the Modeling toolbar include ________.

A. Box

B. Sphere

C. Extrude

D. All of the above

What is the correct answer?

4

These units are based on inch-foot and yard measurements:

A. International customary units

B. U.S. metric units

C. U.S. customary units

D. ISO international units

What is the correct answer?

4

Spur gear design normally begins with selecting this:

A. Rack size

B. Tooth size

C. Gear size

D. Pitch diameter

What is the correct answer?

4

The UCS icon represents the intersection of the ________.

A. X-axis

B. Y-axis

C. Z-axis

D. All of the above

What is the correct answer?

4

On a floor plan the dashed line that appears approximately 24 outside the exterior wall represents the __________.

A. Sidewalk

B. Roof overhang

C. Plumbing drain lines

D. None of the above

What is the correct answer?

4

The section view drawing in which one fourth of an object has been marked for removal is known as a ________ section.

A. Full

B. Half

C. Quarter

D. None of the above

What is the correct answer?

4

Which of the following is one of the basic types of welded joints:

A. T-joint

B. Rear joint

C. Angle joint

D. Groove joint

What is the correct answer?

4

Architectural drafters generally prefer to use ________ drawings to help illustrate 3-dimensional views of a structure.

A. Isometric

B. Perspective

C. Orthographic

D. Auxiliary

What is the correct answer?

4

In this type of auxiliary view, a break line is used to indicate the imaginary break in the views:

A. Primary

B. Secondary

C. Revolved

D. Partial

What is the correct answer?

4

The architectural drafter usually begins a set of working drawings by creating the ________ plan first.

A. Foundation

B. Floor plan

C. Elevations

D. Building section

What is the correct answer?

4

An Auto-CAD term that refers to a pre-drawn object which is stored in a drawing file and can be inserted into any other drawing file as needed is a ________.

A. Block

B. Brick

C. Balloon

D. None of the above

What is the correct answer?

4

When the receding lines are true length, and the projectors are at 45 degrees to the plane of projection, the oblique drawing is called this:

A. Cabinet projection

B. Cavalier projection

C. Axonometric projection

D. Isometric projection

What is the correct answer?

4

The default position of the UCS icon is positioned at ________ on the AutoCAD grid.

A. 0, 0, 0

B. 10, 10, 10

C. 20, 20, 20

D. None of the above

What is the correct answer?

4

A ________ is the person responsible for verifying that the drawings in a project set are free of mistakes.

A. Client

B. CAD trainee

C. Receptionist

D. Checker

What is the correct answer?

4

The Press-Pull tool will ________ the face of a solid model in the direction it faces.

A. Taper

B. Extrude

C. Spiral

D. None of the above

What is the correct answer?

4

A ________ section allows the drafter to create a Cutting Plane line which is not in a straight line across the part.

A. Offset

B. Half

C. Whole

D. Broken out

What is the correct answer?

4

This is the most common application for developments and intersections:

A. Sheet metal construction

B. Piping

C. Architecture

D. Mechanical engineering

What is the correct answer?

4

One critical issue drafters need to pay close attention to is the ________.

A. Size of the sheet

B. Designer's intent

C. Scale factor

D. None of the above

What is the correct answer?

4

These are joined together in the field to build a structure:

A. Riveted members

B. Main members

C. Steel fabrications

D. Assembled fabrications

What is the correct answer?

4

These maps are used to plan construction projects that locate construction features so they fit the topography of the area:

A. Subdivision plats

B. Landscape maps

C. Structural topography maps

D. Structure location plans

What is the correct answer?

4

This should show what changes were made, when, and by whom:

A. Portable document

B. Record of revisions

C. Title form

D. Revision drawings

What is the correct answer?

4

This type of weld is the most common in structural steel fabrication:

A. Fillet weld

B. Beam weld

C. Rivet weld

D. Structural weld

What is the correct answer?

4

This is a flat or rounded tab protruding from a surface, usually to provide a method for attachment:

A. Lug

B. Boss

C. Chamfer

D. Spotface

What is the correct answer?

4

In the mechanical design process the first step is to ________.

A. Brainstorm solutions

B. Prepare rough sketches

C. Prepare a budget

D. Identify the problem

What is the correct answer?

4

When drawing a line using the relative coordinate system a line is created from ________.

A. 0, 0

B. The ending point of the last line

C. The beginning point of the last line

D. None of the above

What is the correct answer?

4

A line with a tapering width can be easily created by using the __________ tool.

A. Circle

B. Ellipse

C. Line

D. Polyline

What is the correct answer?

4

The building construction industry relies on sets of ________ drawings to construct homes and commercial buildings.

A. Mechanical

B. Isometric

C. Architectural working

D. All of the above

What is the correct answer?

4

When designing a home for a client, one of the most important predesign considerations that an architect needs to address is ________.

A. How much money the client is willing to spend

B. The site on which the house is to sit

C. The nearest grocery store

D. Whether or not there is a curb and gutter system