Home
Current Affairs January 2024

What is the correct answer?

4

Newer versions of Auto-CAD utilize the ________ to make block library management very easy.

A. File / find

B. Design Center

C. File / search

D. None of the above

Correct Answer :

B. Design Center


Related Questions

What is the correct answer?

4

When the receding lines are true length, and the projectors are at 45 degrees to the plane of projection, the oblique drawing is called this:

A. Cabinet projection

B. Cavalier projection

C. Axonometric projection

D. Isometric projection

What is the correct answer?

4

Architectural dimensioning is usually done in ________.

A. Even numbers

B. Feet and inches

C. Feet only

D. Inches only

What is the correct answer?

4

These are accurately drawn maps of cities and towns showing property lines and other features that control property ownership:

A. Monument maps

B. Cadastral maps

C. City maps

D. Topographic maps

What is the correct answer?

4

The top, front, and bottom views align in this manner:

A. Horizontally

B. Vertically

C. According to the planar views

D. Parallel to the frontal plane

What is the correct answer?

4

This type of structural steel drawing shows all dimensions necessary for fabrication:

A. Shop drawings

B. Design drawings

C. Weldment drawings

D. Application drawings

What is the correct answer?

4

5.These items typically are not used in new designs, but are still common in high-power amplifiers:

A. Amplifier tubes

B. Electron tubes

C. Signal relays

D. Switches

What is the correct answer?

4

Baseline dimensions are referenced from a common geometric feature known as a ________.

A. Edge

B. Corner

C. Datum

D. Point of reference

What is the correct answer?

4

These maps are used to plan construction projects that locate construction features so they fit the topography of the area:

A. Subdivision plats

B. Landscape maps

C. Structural topography maps

D. Structure location plans

What is the correct answer?

4

In order to set drawing limits for a C size architectural drawing the drafter should set the limits to ________.

A. 0, 0 and 2, 9

B. 0, 0 and 17, 11

C. 0, 0 and 18, 24

D. 0, 0 and 34, 24

What is the correct answer?

4

In this type of section, one quarter of the object is removed:

A. Revolved section

B. Removed section

C. Quarter section

D. Half section

What is the correct answer?

4

A line drawn with a long section, short dash, and another long section is a ________.

A. Hidden feature

B. Center of a circle

C. Center axis of a hidden cylinder

D. Center of a radius

What is the correct answer?

4

When positioning this feature of perspective projection, the centerline of the cone of visual rays should be directed toward the approximate center of the object:

A. Station point

B. Vanishing point

C. Horizon

D. Ground line

What is the correct answer?

4

If a designer is developing a plan for a project in which the entire part is made out of ¾ thick plywood and he only wants to use one view, he should use the ________ view.

A. Front

B. Top

C. Right

D. Back

What is the correct answer?

4

This is the theoretically exact size from which limits of size are determined:

A. Actual Size

B. Dimensioned size

C. Production size

D. Basic size

What is the correct answer?

4

In this type of concrete, the steel is pre-tensioned before the superimposed load is applied:

A. Aggregate

B. Pre-stressed

C. Reinforced

D. Preloaded

What is the correct answer?

4

The type of line that projects from an object for the express purpose of locating a dimension is a ________ line.

A. Visible

B. Hidden

C. Extension

D. Dimension

What is the correct answer?

4

The default position of the UCS icon is positioned at ________ on the AutoCAD grid.

A. 0, 0, 0

B. 10, 10, 10

C. 20, 20, 20

D. None of the above

What is the correct answer?

4

Inserting blocks into a drawing file usually requires exacting placement. The drafter should insure that ________ is turned on.

A. O Snaps

B. Ortho

C. Grid

D. Dynamic Input

What is the correct answer?

4

The foundation contractor will work with the following architectural plans.

A. Foundation

B. Site plan

C. Floor plan

D. All of the above

What is the correct answer?

4

Circular shapes appear in this fashion when viewed at an angle other than 90 degrees:

A. Circular

B. Elliptical

C. Lengthened

D. Angular

What is the correct answer?

4

Given a situation in which the drafter has crossed extension lines in a drawing what can be done to clean up the point of crossing?

A. Use the Modify tool to clean up the extension lines

B. Use the Tolerance tool to clean up the extension lines

C. Use the Break tool to clean up the extension lines

D. Use the stretch tool to clean up the extension lines

What is the correct answer?

4

In this type of dimensioning, allowance must be made for bends:

A. Angular

B. Tolerance

C. Datum

D. Sheet metal

What is the correct answer?

4

Most architectural firms and mechanical design companies utilize different categories of blocks. These sets of blocks are usually housed in ________.

A. Block vaults

B. Block libraries

C. Block books

D. Block references

What is the correct answer?

4

In a CAD system, you can draw an ellipse by specifying these:

A. The bounding lines

B. The midpoint and end points

C. The center and major and minor axes

D. The center and radius

What is the correct answer?

4

A cylinder can be created by drawing a rectangular shape then the ________ tool.

A. Revolve

B. Sweep

C. Extrude

D. None of the above

What is the correct answer?

4

In working drawings, these show all necessary information not given directly on the drawing with its dimensions and notes:

A. Document strips

B. Portable documents

C. Formatting forms

D. Title and record strips

What is the correct answer?

4

These are lines drawn on a map to locate, in the plan view, points of equal ground elevation:

A. Contours

B. Elevations

C. Profiles

D. Hatches

What is the correct answer?

4

Architectural dimensioning standards allow for the placement of dimensions inside the floor plan. These inside dimensions locate interior __________.

A. Door openings and walls

B. Centers of cabinets

C. Windows

D. All of the above

What is the correct answer?

4

An architect often relies on a ________ to complete the set of technical drawings used in the design of an office building.

A. Technical illustrator

B. Artist

C. Drafter

D. Construction superintendent

What is the correct answer?

4

This process recognizes the inherent interrelationships between design and manufacturing:

A. Design for manufacture

B. Design for manufacture and assembly

C. Design for concurrent engineering

D. Design for assembly