Cracks appear on the plastered surface in the form of hair cracks
In brick work, the efflorescence is removed by applying a solution of zinc sulphate and water
Excessive thermal variations in the backing or plaster causes the plaster to fall
All the above
D. All the above
Black cotton soil
Loose fine sandy soil
Dry coarse sandy soil
Hard rocks
Draining sub-soil water
Ramming crushed stone in soil
Driving sand piles
Watering surface of soil
Strip footing
Strap footing
Combined footing
Raft footing
Ridge
Hip
Valley
None of these
The direction of the prevailing winds in the area
The exposure of the walls and roof of the buildings to the rays of sun
The extent up to which the sunrays penetrate with the verandah
All the above
10 cm
15 cm
Equal to its projection beyond wall base
Less than its projection beyond wall base
Free from voids
Glossy
Durable
Uniform
2.5 m
3.5 m
4.5 m
5.5 m
To support the frame work of the roof
To receive the ends of principal rafter
To prevent the walls from spreading outward
To prevent the tie beam from sagging at its centre
English bond
Stretcher bond
Header bond
Single Flemish bond
Is a metamorphic rock
Splits into thin sheets along its bedding planes
Has a smooth surface and contains alumina and silica
Possesses good water absorption capacity
Purlin
Cleat
Batten
Strut
Hard rock
Moist clay
Soft rock
Coarse sandy soil
Simplex pile
Pedestal pile
Vibro pile
Both (a) and (c) of the above
Upper horizontal wooden member
Lower horizontal wooden member
Intermediate horizontal wooden member
Vertical wooden member
Reinforced marble floor
Terrazzo floor
Marble floor
Chip floor
Cavity of a cavity wall should start near ground level
Cavity of a cavity wall should terminate near eaves level of sloping roof
Cavity of a cavity wall should terminate near coping of flat roof with parapet wall
All the above
Ashlar arch
Rubble arch
Gauged brick arch
Axed brick arch
Buttress
Leaf wall
Pilaster
Pillar
25 to 50 mm
25 to 75 mm
30 to 125 mm
50 to 100 mm
10
12
15
No limit
English cross bond
Dutch bond
Monk bond
Rat-trap bond
Platform
Relief
Rest
Landing
Intrados
Rise
Spandril
Extrados
Both A and R is true and R is the correct explanation of A
Both A and R is true but R is not the correct explanation of A
A is true but R is false
A is false but R is true
1 cm per metre length
2 cm per metre length
4 cm per metre length
5 cm per metre length
du
1.25 du
1.5 du
1.75 du
H-pile
Screw pile
Disc pile
Pipe pile
(i) and (iii)
(i) and (iv)
(ii) and (iii)
(ii) and (iv)
1/2
1
2
1/4