What is the correct answer?

4

Proper batching ensures

A. Economy

B. Durability

C. Workability

D. All the above

Correct Answer :

D. All the above


Related Questions

What is the correct answer?

4

The size of fine aggregates does not exceed

A. 2.75 mm

B. 3.00 mm

C. 3.75 mm

D. 4.75 mm

What is the correct answer?

4

Which of the following R.C. retaining walls is suitable for heights beyond 6 m?

A. L-shaped wall

B. T-shaped wall

C. Counterfort type

D. All of the above

What is the correct answer?

4

The internal dimensions of a ware house are 15 m × 5.6 m, and the maximum height of piles is 2.70 m, the maximum number of bags to be stored in two piles, are

A. 1500 bags

B. 2000 bags

C. 2500 bags

D. 3000 bags

What is the correct answer?

4

The commercial name of white and coloured cement in India, is

A. Colorcrete

B. Silvicrete

C. Snowcem

D. All the above

What is the correct answer?

4

Which of the following has high tensile strength?

A. Plain hot rolled wires

B. Cold drawn wires

C. Heat treated rolled wires

D. All have same tensile strength

What is the correct answer?

4

Separation of water or water sand cement from a freshly concrete, is known

A. Bleeding

B. Creeping

C. Segregation

D. Flooding

What is the correct answer?

4

The design yield stress of steel according to IS: 4561978 is: (Where fy is the characteristic yield strength of steel)

A. 0.37 fy

B. 0.57 fy

C. 0.67 fy

D. 0.87 fy

What is the correct answer?

4

Pick up the correct statement from the following:

A. According to the petrological characteristics, concrete aggregates are classified as heavy weight, normal weight and light weight

B. According to the shape of the particles, concrete aggregates are classified as rounded irregular, angular and flaky

C. According to the surface texture of the particles, the concrete aggregates are classified as glassy, smooth, granular, rough, crystalline, honey combed and porous

D. All the above

What is the correct answer?

4

A concrete using an air entrained cement

A. Has strength less than 10% to 15%

B. Has more resistance to weathering

C. Is more plastic and workable

D. Is free from segregation and bleeding

What is the correct answer?

4

Pick up the correct statement from the following:

A. Sand stones may be divided into calcareous, siliceous and ferruginous sand stones

B. Concrete using sand stones, cracks due to excessive shrinkage

C. Broken bricks produce a concrete having good fire resisting qualities

D. All the above

What is the correct answer?

4

Pick up the incorrect statement from the following:

A. The bottom and top ends of slump mould are parallel to each other

B. The axis of the mould is perpendicular to the end faces

C. The internal surface of the mould is kept clean and free from set cement

D. The mould is in the form of a frustum of hexagonal pyramid

What is the correct answer?

4

High temperature

A. Increases the strength of concrete

B. Decreases the strength of concrete

C. Has no effect on the strength of concrete

D. None of these

What is the correct answer?

4

The most useless aggregate is one whose surface texture is

A. Smooth

B. Granular

C. Glassy

D. Honey combed and porous

What is the correct answer?

4

While designing an air entrained concrete

A. Water cement ratio is reduced

B. Proportion of aggregates is reduced

C. An allowance for the entrained air is made

D. All the above

What is the correct answer?

4

A beam curved in plan is designed for

A. Bending moment and shear

B. Bending moment and torsion

C. Shear and torsion

D. Bending moment, shear and torsion

What is the correct answer?

4

If P, Y and Z are the weights of cement, fine aggregates and coarse aggregates respectively and W/C is the water cement ratio, the minimum quantity of water to be added to first batch, is obtained by the equation

A. 0.1P + 0.3Y + 0.1Z = W/C × P

B. 0.3P + 0.1Y + 0.01Z = W/C × P

C. 0.4P + 0.2Y + 0.01Z = W/C × P

D. 0.5P + 0.3Y + 0.01Z = W/C × P

What is the correct answer?

4

You are asked to construct a massive dam, the type of cement you will use, is

A. Ordinary Portland cement

B. Rapid hardening cement

C. Low heat cement

D. Blast furnace slag cement

What is the correct answer?

4

For a reinforced concrete section, the shape of shear stress diagram is

A. Wholly parabolic

B. Wholly rectangular

C. Parabolic above neutral axis and rectangular below neutral axis

D. Rectangular above neutral axis and parabolic below neutral axis

What is the correct answer?

4

Admixtures which cause early setting and hardening of concrete are called

A. Workability admixtures

B. Accelerators

C. Retarders

D. Air entraining agents

What is the correct answer?

4

For concreting tunnel linings, transportation of concrete is done by

A. Pans

B. Wheel borrows

C. Containers

D. Pumps

What is the correct answer?

4

The preliminary test is repeated if the difference of compressive strength of three test specimens, exceeds

A. 5 kg/cm2

B. 8 kg/cm2

C. 10 kg/cm2

D. 15 kg/cm2

What is the correct answer?

4

Strength of concrete increases with

A. Increase in water-cement ratio

B. Increase in fineness of cement

C. Decrease in curing time

D. Decrease in size of aggregate

What is the correct answer?

4

In a spherical dome subjected to concentrated load at crown or uniformly distributed load, the meridional force is always

A. Zero

B. Tensile

C. Compressive

D. Tensile or compressive

What is the correct answer?

4

In slump test, each layer of concrete is compacted by a steel rod 60 cm long and of 16 mm diameter for

A. 20 times

B. 25 times

C. 30 times

D. 50 times

What is the correct answer?

4

The maximum amount of dust which may be permitted in aggregates is

A. 5% of the total aggregates for low workability with a coarse grading

B. 10% of the total aggregates for low workability with a fine grading

C. 20% of the total aggregates for a mix having high workability with fine grading

D. All the above

What is the correct answer?

4

The lower water cement ratio in concrete, introduces

A. Smaller creep and shrinkage

B. Greater density and smaller permeability

C. Improved frost resistance

D. All the above

What is the correct answer?

4

The purpose of reinforcement in pre-stressed concrete is

A. To provide adequate bond stress

B. To resist tensile stresses

C. To impart initial compressive stress in concrete

D. All of the above

What is the correct answer?

4

The condition not applicable to water cement ratio law, is

A. Internal moisture conditions on hydration continue till complete strength is gained

B. Concrete specimens may be tested at any temperature

C. Concrete specimens need be of same age

D. Concrete specimens need be of same size

What is the correct answer?

4

Vicat apparatus is used for

A. Fineness test

B. Consistency test

C. Test for setting time

D. Test for tensile strength

What is the correct answer?

4

The produce impermeable concrete

A. Thorough mixing of concrete is required

B. Proper compaction of concrete is required

C. Proper curing of concrete is required

D. All the above