Home
You can do it
  1. Gantt charts are used for
  2. What does symbol 'V' employ in work study
  3. The mathematical technique for finding the best use of limited resources in an optimum manner is known…
  4. The time of completing a project in network analysis is given by following time of the critical activity…
  5. The main object of scientific layout is
  6. According to Rowan plan of wage incentive system, bonus is paid to a worker
  7. ABC analysis deals with
  8. PMTP (predetermined motion time systems) include
  9. In fixed position layout
  10. Dummy activities are used to
  11. PERT and CPM are
  12. The most popular type of organisation used for Civil Engineering Constructions is
  13. The factors which are to be considered while developing a good wage incentive plan will include
  14. An event is indicated on the network by
  15. The interchangeability can be achieved by
  16. Which of the following organisations is best suited for steel plants
  17. Which of the following depreciation system ensures that the interest be charged on the cost of machine…
  18. The objective of time study is to determine the time required to complete a job by
  19. P.M.T.S. (Predetermined Motion Time Systems) include
  20. Two alternatives can produce a product. First have a fixed cost of Rs. 2000 and a variable cost of Rs.…
  21. Product layout is employed for
  22. Merit Rating is the method of determining worth of
  23. Basic tool in work study is
  24. CPM requires
  25. In jobbing production
  26. The first method invented for planning projects was
  27. Micro motion study is
  28. Choose the wrong statement. Motion study is used for
  29. PERT analysis is based upon
  30. Standard time is defined as