Home

The first step in creating a traditional technical drawing is to ________.

A. Draw a series of guide lines

B. Set up the meter line

C. Align the paper so that it will be positioned square to the parallel bar

D. Sharpen the leads in the technical pens

Related Questions

  1. Some common blocks used by architectural drafters include ________.
  2. This is a line terminated by arrowheads, indicating the direction and extent of a dimension:
  3. Referring to the fractional inches to decimal inches to millimetre conversion chart on page 55 what…
  4. In this type of view, the cutting plane line indicates both the location of the cutting plane and the…
  5. The View toolbar will position the view of the 3-D solid toward the ________.
  6. In U.S. structural and architectural drafting, all dimensions of this length are usually expressed in…
  7. In architectural drawing ________ are often used to illustrate and detail structural components.
  8. This type of weld is the most common in structural steel fabrication:
  9. This should show what changes were made, when, and by whom:
  10. Several of the tools used in traditional drafting include the following:
  11. Lines of an isometric drawing that are not parallel to the isometric axes are called this:
  12. The Offset tool should only be used for placing ________ in an isometric drawing.
  13. A partial auxiliary view is used to show only the ________ in the auxiliary view.
  14. When positioning this feature of perspective projection, the centerline of the cone of visual rays should…
  15. The dimension text size is determined by what the architect deems necessary in __________.
  16. An Auto-CAD term that refers to a pre-drawn object which is stored in a drawing file and can be inserted…
  17. The standard number of threads per inch for various diameters is the:
  18. Dimension text is generally placed above the ________ line.
  19. 9.The lines used to create the auxiliary view should appear as ________ in the finished view.
  20. In working drawings, these show all necessary information not given directly on the drawing with its…
  21. Center lines are used to locate or represent the centers of ________.
  22. Traditional drafters need to be able to create several different line widths because ________.
  23. Dimensions are used on the elevation plan to describe ________.
  24. The UCS icon represents the intersection of the ________.
  25. EDM is the acronym for:
  26. Schematic and single-line diagrams should be arranged so that signal or transmission path from input…
  27. These drawings are given to contractors to perform work or manufacture individual parts:
  28. In order to create one solid model from two or more separate solid shapes the drafter will need to position…
  29. Approximately this much of the cost of product development and manufacture is determined at the design…
  30. These weld symbols have no arrow-side or other-side significance:

Please do not use chat terms. Example: avoid using "grt" instead of "great".