Home
Current Affairs January 2024

What is the correct answer?

4

The MASSPROP shortcut will provide the following information.

A. Mass

B. Volume

C. Bounding box

D. All of the above

Correct Answer :

D. All of the above


Related Questions

What is the correct answer?

4

Newer versions of Auto-CAD utilize the ________ to make block library management very easy.

A. File / find

B. Design Center

C. File / search

D. None of the above

What is the correct answer?

4

Once a drawing is determined to be complete, the title block is used to document the change from:

A. A draft to a finished drawing

B. A finished to a working drawing

C. An assembly to a finished drawing

D. A working drawing to a draft

What is the correct answer?

4

This is a flat or rounded tab protruding from a surface, usually to provide a method for attachment:

A. Lug

B. Boss

C. Chamfer

D. Spotface

What is the correct answer?

4

In this type of view, the cutting plane line indicates both the location of the cutting plane and the direction of sight:

A. Removed section

B. Revolved section

C. Auxiliary section

D. Partial section

What is the correct answer?

4

This allows the designer to conceptualize objects more easily without having to make costly illustrations, models, or prototypes:

A. Computer-aided manufacturing

B. Computer-aided design

C. Computer-aided engineering

D. Computer-aided prototyping

What is the correct answer?

4

When using versions of Auto-CAD prior to Release 2006 it may be necessary to ________ a block in order to edit it.

A. Copy

B. Explode

C. Offset

D. None of the above

What is the correct answer?

4

Acceptable parts must not extend beyond this:

A. Boundary limits

B. Hole limits

C. Specification

D. Tolerances

What is the correct answer?

4

The UCS icon represents the intersection of the ________.

A. X-axis

B. Y-axis

C. Z-axis

D. All of the above

What is the correct answer?

4

When filling an area with a hatch pattern in Auto-CAD the drafter needs to be able to ________.

A. See the entire bounding area to hatch

B. Set Ortho on

C. Turn ISO grid off

D. Set the layer to Defpoints

What is the correct answer?

4

In the section view, the areas that would have been in actual contact with the cutting plane are shown with:

A. A cutting plane line

B. Section lining

C. Visible lines

D. Lines and arrows

What is the correct answer?

4

The architectural drafter usually begins a set of working drawings by creating the ________ plan first.

A. Foundation

B. Floor plan

C. Elevations

D. Building section

What is the correct answer?

4

Approximately this much of the cost of product development and manufacture is determined at the design stage:

A. 40-50 %

B. 60-75 %

C. 70-80 %

D. 75-85 %

What is the correct answer?

4

Drafters should use a ________ in a section view of a mechanical part that includes the cylindrical view of a threaded hole.

A. Center line

B. Hatch line

C. Poly line

D. Dimension line

What is the correct answer?

4

Welding drawings are a special type of this kind of drawing:

A. Symbol

B. Perspective

C. Assembly

D. Isometric

What is the correct answer?

4

In this type of dimensioning, allowance must be made for bends:

A. Angular

B. Tolerance

C. Datum

D. Sheet metal

What is the correct answer?

4

If a designer is developing a plan for a project in which the entire part is made out of ¾ thick plywood and he only wants to use one view, he should use the ________ view.

A. Front

B. Top

C. Right

D. Back

What is the correct answer?

4

This type of axonometric drawing has equal foreshortening along two axis directions and a different amount on the third axis:

A. Dimetric

B. Multiview

C. Isometric

D. Trimetric

What is the correct answer?

4

The offset distance for the width (front to back) distance of the auxiliary view is the same distance of the ________ in the top view.

A. Width

B. Height

C. Length

D. None of the above

What is the correct answer?

4

4.The principle reason for using an auxiliary view is ________.

A. To eliminate hidden lines

B. To create a true projection plane from an inclined plane in one of the primary views

C. To show cylinders as ellipses

D. To locate center marks

What is the correct answer?

4

When drawing a line using the relative coordinate system a line is created from ________.

A. 0, 0

B. The ending point of the last line

C. The beginning point of the last line

D. None of the above

What is the correct answer?

4

The default position of the UCS icon is positioned at ________ on the AutoCAD grid.

A. 0, 0, 0

B. 10, 10, 10

C. 20, 20, 20

D. None of the above

What is the correct answer?

4

This type of drawing shows two lines representing the pipe diameter:

A. Single-line

B. Double-line

C. Standard piping

D. Centerline piping

What is the correct answer?

4

Architectural drawings used to construct a house are often plotted with a scale of ¼ = 1'-0. What scale is this?

A. Quarter

B. Half

C. Full

D. Double

What is the correct answer?

4

This type of solid is egg-shaped and can be created by revolving an ellipse around one of its axes:

A. Ellipsoid

B. Torus

C. Cone

D. Cylinder

What is the correct answer?

4

In U.S. structural and architectural drafting, all dimensions of this length are usually expressed in feet and inches:

A. One inch or over

B. One foot or over

C. One yard or over

D. One rod or over

What is the correct answer?

4

This allows the performance of structures to be analyzed and tested efficiently, accurately, and quickly:

A. Computer-aided manufacturing

B. Computer-aided design

C. Computer-aided engineering

D. Computer-aided prototyping

What is the correct answer?

4

Center lines are used to locate or represent the centers of ________.

A. Arcs

B. Circles

C. Hidden round features

D. All of the above

What is the correct answer?

4

These types of projectors converge at a vanishing point:

A. Perspective

B. Parallel

C. Orthographic

D. Oblique

What is the correct answer?

4

EDM is the acronym for:

A. Enterprise data management

B. Engineering drawing management

C. Enterprise drawing manipulation

D. Engineering data manipulation

What is the correct answer?

4

These are special installations of stone or concrete marking the locations of points accurately determined by precise surveying:

A. Topographic marks

B. Hatches

C. Monuments

D. Pillars