Related Questions
What is the correct answer?
4
Newer versions of Auto-CAD utilize the ________ to make block library management very easy.
What is the correct answer?
4
Once a drawing is determined to be complete, the title block is used to document the change from:
A. A draft to a finished drawing
B. A finished to a working drawing
C. An assembly to a finished drawing
D. A working drawing to a draft
What is the correct answer?
4
This is a flat or rounded tab protruding from a surface, usually to provide a method for attachment:
What is the correct answer?
4
In this type of view, the cutting plane line indicates both the location of the cutting plane and the direction of sight:
What is the correct answer?
4
This allows the designer to conceptualize objects more easily without having to make costly illustrations, models, or prototypes:
A. Computer-aided manufacturing
C. Computer-aided engineering
D. Computer-aided prototyping
What is the correct answer?
4
When using versions of Auto-CAD prior to Release 2006 it may be necessary to ________ a block in order to edit it.
What is the correct answer?
4
Acceptable parts must not extend beyond this:
What is the correct answer?
4
The UCS icon represents the intersection of the ________.
What is the correct answer?
4
When filling an area with a hatch pattern in Auto-CAD the drafter needs to be able to ________.
A. See the entire bounding area to hatch
D. Set the layer to Defpoints
What is the correct answer?
4
In the section view, the areas that would have been in actual contact with the cutting plane are shown with:
What is the correct answer?
4
The architectural drafter usually begins a set of working drawings by creating the ________ plan first.
What is the correct answer?
4
Approximately this much of the cost of product development and manufacture is determined at the design stage:
What is the correct answer?
4
Drafters should use a ________ in a section view of a mechanical part that includes the cylindrical view of a threaded hole.
What is the correct answer?
4
Welding drawings are a special type of this kind of drawing:
What is the correct answer?
4
In this type of dimensioning, allowance must be made for bends:
What is the correct answer?
4
If a designer is developing a plan for a project in which the entire part is made out of ¾ thick plywood and he only wants to use one view, he should use the ________ view.
What is the correct answer?
4
This type of axonometric drawing has equal foreshortening along two axis directions and a different amount on the third axis:
What is the correct answer?
4
The offset distance for the width (front to back) distance of the auxiliary view is the same distance of the ________ in the top view.
What is the correct answer?
4
4.The principle reason for using an auxiliary view is ________.
A. To eliminate hidden lines
B. To create a true projection plane from an inclined plane in one of the primary views
C. To show cylinders as ellipses
D. To locate center marks
What is the correct answer?
4
When drawing a line using the relative coordinate system a line is created from ________.
B. The ending point of the last line
C. The beginning point of the last line
What is the correct answer?
4
The default position of the UCS icon is positioned at ________ on the AutoCAD grid.
What is the correct answer?
4
This type of drawing shows two lines representing the pipe diameter:
What is the correct answer?
4
Architectural drawings used to construct a house are often plotted with a scale of ¼ = 1'-0. What scale is this?
What is the correct answer?
4
This type of solid is egg-shaped and can be created by revolving an ellipse around one of its axes:
What is the correct answer?
4
In U.S. structural and architectural drafting, all dimensions of this length are usually expressed in feet and inches:
What is the correct answer?
4
This allows the performance of structures to be analyzed and tested efficiently, accurately, and quickly:
A. Computer-aided manufacturing
C. Computer-aided engineering
D. Computer-aided prototyping
What is the correct answer?
4
Center lines are used to locate or represent the centers of ________.
What is the correct answer?
4
These types of projectors converge at a vanishing point:
What is the correct answer?
4
EDM is the acronym for:
A. Enterprise data management
B. Engineering drawing management
C. Enterprise drawing manipulation
D. Engineering data manipulation
What is the correct answer?
4
These are special installations of stone or concrete marking the locations of points accurately determined by precise surveying: