The performance of a specific task in CPM is known as

A. Dummy

B. Event

C. Activity

D. Contract

Please do not use chat terms. Example: avoid using "grt" instead of "great".

You can do it
  1. For a small scale industry, the fixed cost per month is Rs. 5000. The variable cost per product is Rs.…
  2. The difference between the time available to do the job and the time required to do the job, is known…
  3. A systematic job improvement sequence will consist of
  4. The breakeven point represents
  5. ABC analysis deals with
  6. Pick up the correct step used for scheduling a project by C.P.M.
  7. In product layout
  8. At the breakeven point,
  9. In a line organisation
  10. The wastage of material in the store is taken into account by the following method in the evaluation…
  11. Acceptance sampling is used in
  12. PERT
  13. CPM is the
  14. Pick up the correct statement from the following
  15. The mathematical technique for finding the best use of limited resources in an optimum manner is known…
  16. If TL is the largest allowable event occurrence time, total activity slack (s) is equal to
  17. Which of the following equations is not in conformity with others?
  18. Choose the wrong statement Time study is used to
  19. Pick up the incorrect statement from the following
  20. PERT is
  21. If A is the total items consumed per year, P is the procurement cost per order, and C is the annual…
  22. The standard time for a job is
  23. Which of the following statement is wrong?
  24. The main object of scientific layout is
  25. Queueing theory deals with problems of
  26. Micro motion study is
  27. What does symbol 'O' imply in work study?
  28. The time taken by a trained worker to perform an operation, while working a steady pace, is known as
  29. The time by which the activity completion time can be delayed without affecting the start of succeeding…
  30. According to MAPI formula, the old machine should be replaced by new one when (CAM = Challenger's Adverse…