Related Questions
What is the correct answer?
4
If a designer is developing a plan for a project in which the entire part is made out of ¾ thick plywood and he only wants to use one view, he should use the ________ view.
What is the correct answer?
4
EDM is the acronym for:
A. Enterprise data management
B. Engineering drawing management
C. Enterprise drawing manipulation
D. Engineering data manipulation
What is the correct answer?
4
This allows the designer to conceptualize objects more easily without having to make costly illustrations, models, or prototypes:
A. Computer-aided manufacturing
C. Computer-aided engineering
D. Computer-aided prototyping
What is the correct answer?
4
Architectural dimensioning is usually done in ________.
What is the correct answer?
4
In a CAD system, you can draw an ellipse by specifying these:
B. The midpoint and end points
C. The center and major and minor axes
What is the correct answer?
4
A line drawn with a long section, short dash, and another long section is a ________.
C. Center axis of a hidden cylinder
What is the correct answer?
4
This is the smallest diameter of a screw thread:
A. Internal thread diameter
D. External thread diameter
What is the correct answer?
4
In developing a multi-view drawing, the drafter can use a ________ line to help locate the top and right side views.
What is the correct answer?
4
This is the bottom surface joining the sides of two adjacent threads:
What is the correct answer?
4
Once the architect has finalized the house plans with the client any changes to the design requested by the client will require a ________.
C. Whole new set of drawings
What is the correct answer?
4
On a floor plan the dashed line that appears approximately 24 outside the exterior wall represents the __________.
What is the correct answer?
4
Acceptable parts must not extend beyond this:
What is the correct answer?
4
Using the Relative Polar Coordinate System to add a 3 inch line that is 45 degrees from the end point of the line created above the drafter would ________.
B. Type 3 back slash and enter
C. Type 3 forward slash and enter
D. Type 3 and try to use the Dynamic Input readout to find the end point
What is the correct answer?
4
An engineer's scale would be used to measure lines on a drawing where the scale factor reads ________.
What is the correct answer?
4
These types of projectors converge at a vanishing point:
What is the correct answer?
4
This is the term for the range of tightness or looseness resulting from the allowances and tolerances in mating parts:
What is the correct answer?
4
These are special installations of stone or concrete marking the locations of points accurately determined by precise surveying:
What is the correct answer?
4
The site plan illustrates ________.
B. Where the house sits on the property
D. Where the garage and driveway are located
What is the correct answer?
4
An oil refinery relies on which type of drafter to maintain and update the technical piping drawings used for the construction and maintenance of the facility.
What is the correct answer?
4
When lettering a CAD drawing, for clarity you should limit the number of fonts to:
What is the correct answer?
4
These breaks are used to shorten the view of an object:
What is the correct answer?
4
The Offset tool should only be used for placing ________ in an isometric drawing.
What is the correct answer?
4
When dimensioning architectural drawings architects will utilize both ________ and ________ options.
A. Baseline and continuous
What is the correct answer?
4
These maps are used to plan construction projects that locate construction features so they fit the topography of the area:
C. Structural topography maps
D. Structure location plans
What is the correct answer?
4
Welding drawings are a special type of this kind of drawing:
What is the correct answer?
4
A cylinder can be created by drawing a rectangular shape then the ________ tool.
What is the correct answer?
4
Auto-CAD refers to isometric ellipses as ________.
What is the correct answer?
4
Generally, the units used on an architectural drawing are set to ________.
What is the correct answer?
4
These drawings are given to contractors to perform work or manufacture individual parts:
What is the correct answer?
4
The ________ tool on the Dimension tool bar will place several dimensions at one time by using a selection box placed over several part features.