Home
Current Affairs January 2024

What is the correct answer?

4

The View toolbar will position the view of the 3-D solid toward the ________.

A. Front

B. Left side

C. SE isometric

D. All of the above

Correct Answer :

D. All of the above


Related Questions

What is the correct answer?

4

In offset sections, offsets or bends in the cutting plane are all:

A. 90 degrees

B. 180 degrees

C. Either 90 or 180 degrees

D. 30, 60 or 90 degrees

What is the correct answer?

4

This allows the designer to conceptualize objects more easily without having to make costly illustrations, models, or prototypes:

A. Computer-aided manufacturing

B. Computer-aided design

C. Computer-aided engineering

D. Computer-aided prototyping

What is the correct answer?

4

A back or backing weld is a type of:

A. Groove weld

B. Resistance weld

C. Arc and gas weld

D. Upset weld

What is the correct answer?

4

A partial auxiliary view is used to show only the ________ in the auxiliary view.

A. Projected inclined plane

B. The projected top view

C. The projected side view

D. None of the above

What is the correct answer?

4

Newer versions of Auto-CAD utilize the ________ to make block library management very easy.

A. File / find

B. Design Center

C. File / search

D. None of the above

What is the correct answer?

4

By using a ________ section of a cylindrical mechanical part the drafter should be able to show only one view of the part.

A. Half

B. Whole

C. Revolved

D. Broken out

What is the correct answer?

4

The offset distance for the width (front to back) distance of the auxiliary view is the same distance of the ________ in the top view.

A. Width

B. Height

C. Length

D. None of the above

What is the correct answer?

4

An architect often relies on a ________ to complete the set of technical drawings used in the design of an office building.

A. Technical illustrator

B. Artist

C. Drafter

D. Construction superintendent

What is the correct answer?

4

Drafters should use a ________ in a section view of a mechanical part that includes the cylindrical view of a threaded hole.

A. Center line

B. Hatch line

C. Poly line

D. Dimension line

What is the correct answer?

4

Angles project true size only when the plane containing the angle and plane of projection are this:

A. Adjacent

B. Aligned

C. Perpendicular

D. Parallel

What is the correct answer?

4

Oblique drawings are dimensioned in a similar fashion as these types of drawings:

A. Orthographic

B. Isometric

C. Angular

D. Parallel

What is the correct answer?

4

When the drafter types the word BLOCK or selects the Make Block tool from the Draw tool bar the ________ will appear.

A. Grid

B. Block Text Box

C. Block Definition Dialog

D. None of the above

What is the correct answer?

4

These are joined together in the field to build a structure:

A. Riveted members

B. Main members

C. Steel fabrications

D. Assembled fabrications

What is the correct answer?

4

Most architectural firms and mechanical design companies utilize different categories of blocks. These sets of blocks are usually housed in ________.

A. Block vaults

B. Block libraries

C. Block books

D. Block references

What is the correct answer?

4

This is the bottom surface joining the sides of two adjacent threads:

A. Lead

B. Pitch

C. Crest

D. Root

What is the correct answer?

4

Using the Relative Polar Coordinate System to add a 3 inch line that is 45 degrees from the end point of the line created above the drafter would ________.

A. Type @3<45 and enter

B. Type 3 back slash and enter

C. Type 3 forward slash and enter

D. Type 3 and try to use the Dynamic Input readout to find the end point

What is the correct answer?

4

CAD programs which incorporate parametric modeling utilize a system in which the dimensions control the ________.

A. Size and shape of the model features

B. Perspective of the model

C. Shading used to render the model

D. All of the above

What is the correct answer?

4

Inserting blocks into a drawing file usually requires exacting placement. The drafter should insure that ________ is turned on.

A. O Snaps

B. Ortho

C. Grid

D. Dynamic Input

What is the correct answer?

4

Students can complete an associate's degree in drafting which normally takes about ________ years to complete.

A. One

B. Two

C. Three

D. Four

What is the correct answer?

4

Once the architect has finalized the house plans with the client any changes to the design requested by the client will require a ________.

A. Change order

B. Modification slip

C. Whole new set of drawings

D. None of the above

What is the correct answer?

4

Schematic and single-line diagrams should be arranged so that signal or transmission path from input to output proceeds in this fashion:

A. Right to left and top to bottom

B. Right to left and bottom to top

C. Left to right and top to bottom

D. Left to right and bottom to top

What is the correct answer?

4

In order to create an accurate assembly drawing the drafter should create the ________ drawings first.

A. Detail

B. Title block

C. Parts list

D. Isometric

What is the correct answer?

4

In order to set drawing limits for a C size architectural drawing the drafter should set the limits to ________.

A. 0, 0 and 2, 9

B. 0, 0 and 17, 11

C. 0, 0 and 18, 24

D. 0, 0 and 34, 24

What is the correct answer?

4

This is the smallest diameter of a screw thread:

A. Internal thread diameter

B. Minor diameter

C. Major diameter

D. External thread diameter

What is the correct answer?

4

To avoid having to dimension to a hidden feature the drafter can utilize a ________ section.

A. Whole

B. Half

C. Broken out

D. All of the above

What is the correct answer?

4

To insure that everyone understands what the electrical symbols represent it is customary to include a ________ on the electrical sheet.

A. List

B. Part number

C. Electrical legend

D. Electrical layer

What is the correct answer?

4

Referring to the fractional inches to decimal inches to millimetre conversion chart on page 55 what is the equivalent mm measurement of 3/16 inch.

A. 1.906

B. 4.7625

C. 5.958

D. 14.6844

What is the correct answer?

4

The foundation contractor will work with the following architectural plans.

A. Foundation

B. Site plan

C. Floor plan

D. All of the above

What is the correct answer?

4

The standard number of threads per inch for various diameters is the:

A. Series of thread

B. Lead

C. Major diameter

D. Thread pitch

What is the correct answer?

4

Lines of an isometric drawing that are not parallel to the isometric axes are called this:

A. Trimetric lines

B. Non-isometric lines

C. Multiview lines

D. Dimetric lines