The work study is done by means of

A. Planning chart

B. Process chart

C. Stop watch

D. Any one of these

Please do not use chat terms. Example: avoid using "grt" instead of "great".

You can do it
  1. In PERT analysis, critical path is obtained by joining events having
  2. PERT requires
  3. Value engineering aims at finding out the
  4. Two alternatives can produce a product. First have a fixed cost of Rs. 2000 and a variable cost of Rs.…
  5. Pick up the correct statement. Dummy activity on a PERT/CPM chart means, it
  6. In jobbing production
  7. The most important objective behind plant layout is
  8. When slack of an activity is negative
  9. If TL is the largest allowable event occurrence time, total activity slack (s) is equal to
  10. A big advantage of PERT over Gantt charts is that in the former case
  11. In a PERT chart
  12. The time taken by a trained worker to perform an operation, while working a steady pace, is known as
  13. Pick up the correct statement from the following
  14. The grouping of activities into organisational units is called
  15. Material handling in automobile industry is done by
  16. At the breakeven point,
  17. The main advantage of line organisation is its
  18. M.T.M. is used to
  19. The deductions for, employees provident fund start
  20. Graphical method, simplex method, and transportation method are concerned with
  21. Work sampling is applied for
  22. PERT analysis is based upon
  23. Critical path on PERT/CPM chart is obtained by joining the events having
  24. When slack of an activity is positive
  25. The chart which gives an estimate about the amount of materials handling between various work stations…
  26. Routing
  27. In CPM, the cost slope is determined by
  28. In manufacturing management, the term 'Dispatching' is used to describe
  29. Standard time is equal to
  30. The objective of time study is to determine the time required to complete a job by