What is the correct answer?

4

This is a solid shape that fits inside the mold and forms a hole in a cooled cast metal or molten plastic object:

A. Core

B. Cavity

C. Prototype

D. Hole mold

Correct Answer :

A. Core


Related Questions

What is the correct answer?

4

In working drawings, these show all necessary information not given directly on the drawing with its dimensions and notes:

A. Document strips

B. Portable documents

C. Formatting forms

D. Title and record strips

What is the correct answer?

4

This type of structural steel drawing shows all dimensions necessary for fabrication:

A. Shop drawings

B. Design drawings

C. Weldment drawings

D. Application drawings

What is the correct answer?

4

A partial auxiliary view is used to show only the ________ in the auxiliary view.

A. Projected inclined plane

B. The projected top view

C. The projected side view

D. None of the above

What is the correct answer?

4

Center lines are used to locate or represent the centers of ________.

A. Arcs

B. Circles

C. Hidden round features

D. All of the above

What is the correct answer?

4

This is the plane upon which the top view is projected:

A. Horizontal

B. Frontal

C. Profile

D. Base

What is the correct answer?

4

When creating an isometric drawing in Auto-CAD the drafter can utilize the Dynamic Input and Polar Coordinate system to place both vertical and horizontal lines. A line created from one point 3 inches at 180 degrees would be a ________ line.

A. Horizontal

B. Vertical

C. Inclined

D. None of the above

What is the correct answer?

4

To avoid having to dimension to a hidden feature the drafter can utilize a ________ section.

A. Whole

B. Half

C. Broken out

D. All of the above

What is the correct answer?

4

The MASSPROP shortcut will provide the following information.

A. Mass

B. Volume

C. Bounding box

D. All of the above

What is the correct answer?

4

Using this as a communication and design review tool can help shorten the process and eliminate productivity barriers:

A. Development plans

B. Portable document files

C. The Internet and e-mail

D. Gantt charts

What is the correct answer?

4

Newer versions of Auto-CAD utilize the ________ to make block library management very easy.

A. File / find

B. Design Center

C. File / search

D. None of the above

What is the correct answer?

4

Acceptable parts must not extend beyond this:

A. Boundary limits

B. Hole limits

C. Specification

D. Tolerances

What is the correct answer?

4

On a floor plan the dashed line that appears approximately 24 outside the exterior wall represents the __________.

A. Sidewalk

B. Roof overhang

C. Plumbing drain lines

D. None of the above

What is the correct answer?

4

In order to convert fractional inches into decimal inches ________.

A. Look on a metric conversion chart

B. Divide the numerator (top number) by the denominator (bottom number)

C. Check the engineer's scale

D. All of the above

What is the correct answer?

4

In order to create an isometric circle to represent a hole through the top surface of a box, the drafter must insure that the correct iso-plane has been selected by scrolling through the iso-planes using the ________ key.

A. F1

B. F3

C. F5

D. F8

What is the correct answer?

4

An oil refinery relies on which type of drafter to maintain and update the technical piping drawings used for the construction and maintenance of the facility.

A. Architectural

B. Civil

C. Process piping

D. Electrical

What is the correct answer?

4

Architectural dimensioning is usually done in ________.

A. Even numbers

B. Feet and inches

C. Feet only

D. Inches only

What is the correct answer?

4

In architectural drawing ________ are often used to illustrate and detail structural components.

A. Foundation beam detail sections

B. Wall sections

C. Building sections

D. All of the above

What is the correct answer?

4

In the mechanical design process the first step is to ________.

A. Brainstorm solutions

B. Prepare rough sketches

C. Prepare a budget

D. Identify the problem

What is the correct answer?

4

The distance a screw thread advances axially in one turn is the:

A. Lead

B. Pitch

C. Turn

D. Crest

What is the correct answer?

4

In an oblique drawing, equally spaced partial circles may be used to show this:

A. Symbolic thread pitch

B. Ellipses

C. Cavalier drawings

D. Projection points

What is the correct answer?

4

The thread note for a typical bolt will include the ________.

A. Major diameter of the thread

B. Material

C. Center line

D. Offset distance

What is the correct answer?

4

This is a rounded exterior blend between surfaces:

A. Fillet

B. Round

C. Taper

D. Chamfer

What is the correct answer?

4

The dimension text size is determined by what the architect deems necessary in __________.

A. Model space

B. Paper space

C. The Finished plot

D. The PDF file

What is the correct answer?

4

A partial auxiliary view usually shows only features on the ________ of the inclined line and not any projection of other planes.

A. Hidden lines

B. Plane

C. Center lines

D. None of the above

What is the correct answer?

4

This type of auxiliary view is projected onto a plane that is perpendicular to one of the principal planes of projection:

A. Primary

B. Secondary

C. Revolved

D. Successive

What is the correct answer?

4

When lettering a CAD drawing, for clarity you should limit the number of fonts to:

A. One

B. Two

C. Three

D. Any number

What is the correct answer?

4

The foundation contractor will work with the following architectural plans.

A. Foundation

B. Site plan

C. Floor plan

D. All of the above

What is the correct answer?

4

This type of section is not in direct projection from the view containing the cutting plane:

A. Revolved section

B. Removed section

C. Broken-out section

D. Full section

What is the correct answer?

4

These weld symbols have no arrow-side or other-side significance:

A. Projection or seam weld

B. Back or backing weld

C. Surface or groove weld

D. Flash and upset weld

What is the correct answer?

4

A ________ is the person responsible for verifying that the drawings in a project set are free of mistakes.

A. Client

B. CAD trainee

C. Receptionist

D. Checker