Related Questions
What is the correct answer?
4
Schematic and single-line diagrams should be arranged so that signal or transmission path from input to output proceeds in this fashion:
A. Right to left and top to bottom
B. Right to left and bottom to top
C. Left to right and top to bottom
D. Left to right and bottom to top
What is the correct answer?
4
On typical electronic diagrams, these items need not be shown unless they are needed for clarification:
What is the correct answer?
4
In the section view, the areas that would have been in actual contact with the cutting plane are shown with:
What is the correct answer?
4
The edges of a cube in isometric projection make angles of this many degrees with each other:
What is the correct answer?
4
This is the smallest diameter of a screw thread:
A. Internal thread diameter
D. External thread diameter
What is the correct answer?
4
Some of the common terms used to describe technical drawing include:
What is the correct answer?
4
The condition of a part when it contains the least amount of material is referred to as ________.
What is the correct answer?
4
These units are based on inch-foot and yard measurements:
A. International customary units
D. ISO international units
What is the correct answer?
4
The bounding box method for setting up an isometric drawing helps the drafter ________.
A. Confine the isometric drawing to its maximum size
B. Figure what lines are to be illustrated vertical and horizontal
C. Position the isometric drawing in paper space
What is the correct answer?
4
Most architectural firms and mechanical design companies utilize different categories of blocks. These sets of blocks are usually housed in ________.
What is the correct answer?
4
PDM is the acronym for:
A. Project drawing management
B. Product drawing manipulation
C. Product data management
D. Project data manipulation
What is the correct answer?
4
These are vertical distances above a common datum, reference plane, or point:
What is the correct answer?
4
In perspective drawings this is placed between the observer and the object:
A. Vanishing point / horizon
D. Plane of projection / picture plane
What is the correct answer?
4
When creating an isometric drawing in Auto-CAD the drafter can utilize the Dynamic Input and Polar Coordinate system to place both vertical and horizontal lines. A line created from one point 3 inches at 180 degrees would be a ________ line.
What is the correct answer?
4
This is the total amount that the feature on the actual part is allowed to vary from what is specified by the dimension:
What is the correct answer?
4
Approximately this much of the cost of product development and manufacture is determined at the design stage:
What is the correct answer?
4
This is the theoretically exact size from which limits of size are determined:
What is the correct answer?
4
In U.S. structural and architectural drafting, all dimensions of this length are usually expressed in feet and inches:
What is the correct answer?
4
The building construction industry relies on sets of ________ drawings to construct homes and commercial buildings.
What is the correct answer?
4
The primary unit of measurement for engineering drawings and design in the mechanical industries is the:
What is the correct answer?
4
When designing a home for a client, one of the most important predesign considerations that an architect needs to address is ________.
A. How much money the client is willing to spend
B. The site on which the house is to sit
C. The nearest grocery store
D. Whether or not there is a curb and gutter system
What is the correct answer?
4
An oil refinery relies on which type of drafter to maintain and update the technical piping drawings used for the construction and maintenance of the facility.
What is the correct answer?
4
This type of section is not in direct projection from the view containing the cutting plane:
What is the correct answer?
4
Dimensions are used on the elevation plan to describe ________.
A. Finished floor elevations
What is the correct answer?
4
These types of pipes are generally connected with bell and spigot joints or flanged joints:
What is the correct answer?
4
Once a drawing is determined to be complete, the title block is used to document the change from:
A. A draft to a finished drawing
B. A finished to a working drawing
C. An assembly to a finished drawing
D. A working drawing to a draft
What is the correct answer?
4
This allows the designer to conceptualize objects more easily without having to make costly illustrations, models, or prototypes:
A. Computer-aided manufacturing
C. Computer-aided engineering
D. Computer-aided prototyping
What is the correct answer?
4
A ________ section allows the drafter to create a Cutting Plane line which is not in a straight line across the part.
What is the correct answer?
4
The architectural and construction industries use the United States National CAD standard (NCS) system on many ________ projects.
What is the correct answer?
4
In an exploded assembly drawing it is customary for the drafter to use a ________ line to illustrate how parts fit together.