Home
Current Affairs January 2024

What is the correct answer?

4

This is used in applications for nonferrous construction:

A. Copper tubing

B. Steel pipe

C. PVC pipe

D. Iron tubing

Correct Answer :

A. Copper tubing


Related Questions

What is the correct answer?

4

Some traditional board drafters preferred the drafting machine over the parallel straight edge because it could be used without the need for________.

A. Circle templates

B. Triangles

C. Technical pens

D. Lettering guides

What is the correct answer?

4

An accurate record of changes made to release drawings is tracked via this:

A. A revision block

B. The basic title form

C. Working drawings

D. Portable documents

What is the correct answer?

4

When using the descriptive geometry method to create an auxiliary view the drafter should __________.

A. Rotate the snap grid to the same angle of the inclined plane

B. Offset the right vertical line of the front view

C. Rotate the top line of the front view 45 degrees

D. Offset the top line of the front view 2 inches

What is the correct answer?

4

This is the total amount that the feature on the actual part is allowed to vary from what is specified by the dimension:

A. Allowance

B. Tolerance

C. Specification

D. Difference

What is the correct answer?

4

These types of pipes are generally connected with bell and spigot joints or flanged joints:

A. Soil and waste

B. Water and gas

C. Water and steam

D. Gas and soil

What is the correct answer?

4

This is a curve showing the displacement of the follower as ordinates on a base line that represents one revolution of the cam:

A. Displacement diagram

B. Follower

C. Cam cycle

D. Reciprocation chart

What is the correct answer?

4

This type of projection is when projectors are parallel to each other, but is at an angle other than 90 degrees to the plane of projection:

A. Oblique projection

B. Perpendicular projection

C. Aesthetic projection

D. Angular projection

What is the correct answer?

4

Understanding the Cartesian coordinate system will help the beginning drafter ________.

A. Control the accuracy of the drawing

B. Produce a visible grid system

C. Select a different text style

D. Choose various line types

What is the correct answer?

4

These breaks are used to shorten the view of an object:

A. Section breaks

B. Aligned breaks

C. Conventional breaks

D. Full breaks

What is the correct answer?

4

Several of the tools used in traditional drafting include the following:

A. Parallel straight edge

B. 45 degree triangle

C. Circle template

D. All of the above

What is the correct answer?

4

The building construction industry relies on sets of ________ drawings to construct homes and commercial buildings.

A. Mechanical

B. Isometric

C. Architectural working

D. All of the above

What is the correct answer?

4

The edges of a cube in isometric projection make angles of this many degrees with each other:

A. 30

B. 60

C. 90

D. 120

What is the correct answer?

4

The maximum and minimum sizes of a feature are identified by a ________ tolerance.

A. Limits

B. GD&T

C. Reference

D. Allowance

What is the correct answer?

4

This is used in applications for nonferrous construction:

A. Copper tubing

B. Steel pipe

C. PVC pipe

D. Iron tubing

What is the correct answer?

4

In working drawings, these show all necessary information not given directly on the drawing with its dimensions and notes:

A. Document strips

B. Portable documents

C. Formatting forms

D. Title and record strips

What is the correct answer?

4

Given a situation in which the drafter has crossed extension lines in a drawing what can be done to clean up the point of crossing?

A. Use the Modify tool to clean up the extension lines

B. Use the Tolerance tool to clean up the extension lines

C. Use the Break tool to clean up the extension lines

D. Use the stretch tool to clean up the extension lines

What is the correct answer?

4

To insure that everyone understands what the electrical symbols represent it is customary to include a ________ on the electrical sheet.

A. List

B. Part number

C. Electrical legend

D. Electrical layer

What is the correct answer?

4

5.These items typically are not used in new designs, but are still common in high-power amplifiers:

A. Amplifier tubes

B. Electron tubes

C. Signal relays

D. Switches

What is the correct answer?

4

In order to set drawing limits for a C size architectural drawing the drafter should set the limits to ________.

A. 0, 0 and 2, 9

B. 0, 0 and 17, 11

C. 0, 0 and 18, 24

D. 0, 0 and 34, 24

What is the correct answer?

4

When designing a home for a client, one of the most important predesign considerations that an architect needs to address is ________.

A. How much money the client is willing to spend

B. The site on which the house is to sit

C. The nearest grocery store

D. Whether or not there is a curb and gutter system

What is the correct answer?

4

These gears transmit power between shafts whose axes intersect at any angle:

A. Worm gears

B. Spur gears

C. Bevel gears

D. Racks

What is the correct answer?

4

This is a solid shape that fits inside the mold and forms a hole in a cooled cast metal or molten plastic object:

A. Core

B. Cavity

C. Prototype

D. Hole mold

What is the correct answer?

4

The Offset tool should only be used for placing ________ in an isometric drawing.

A. Circles

B. Horizontal lines

C. Vertical lines

D. None of the above

What is the correct answer?

4

Placement of dimensions on a drawing is controlled by ________.

A. ANSI

B. The design engineer

C. Corporate drafting standards

D. All of the above

What is the correct answer?

4

This is the term for the range of tightness or looseness resulting from the allowances and tolerances in mating parts:

A. Limits

B. Fit

C. Specifications

D. Allowance

What is the correct answer?

4

In perspective drawings this is placed between the observer and the object:

A. Vanishing point / horizon

B. Station point

C. Ground line

D. Plane of projection / picture plane

What is the correct answer?

4

The 3-D commands on the Modeling toolbar include ________.

A. Box

B. Sphere

C. Extrude

D. All of the above

What is the correct answer?

4

This type of auxiliary view is projected onto a plane that is perpendicular to one of the principal planes of projection:

A. Primary

B. Secondary

C. Revolved

D. Successive

What is the correct answer?

4

When dimensioning piping drawings, you give the lengths of all runs of this type:

A. Straight

B. Angular

C. Filleted

D. Transverse

What is the correct answer?

4

An architect often relies on a ________ to complete the set of technical drawings used in the design of an office building.

A. Technical illustrator

B. Artist

C. Drafter

D. Construction superintendent