Time study is carried out to determine the time required to complete job by

A. A slow worker

B. A fast worker

C. An average worker

D. An apprentice

Please do not use chat terms. Example: avoid using "grt" instead of "great".

You can do it
  1. Acceptance sampling is widely used in
  2. In CPM, the cost slope is determined by
  3. Work study is mainly aimed at
  4. In Lincoln plan (one type of group incentive plan), the amount of the profit which an employee receives…
  5. For ship vessel industry the following layout is best suited
  6. If A is the total items consumed per year, P is the procurement cost per order, and C is the annual…
  7. Queueing theory deals with problems of
  8. In steel plant the most important system for materials handling is
  9. A feasible solution to the linear programming problem should
  10. PMTP (predetermined motion time systems) include
  11. PERT requires
  12. Pick up the correct statement from the following
  13. Time study is
  14. Pick up the correct statement about relationship between various floats
  15. The assumption in PERT is
  16. A systematic job improvement sequence will consist of
  17. In Halsey 50-50 plan, output standards are established
  18. The most important objective behind plant layout is
  19. The correct sequence of phases in value engineering is
  20. Two alternatives can produce a product. First have a fixed cost of Rs. 2000 and a variable cost of Rs.…
  21. The artificial activity, which indicates that an activity following it cannot be started unless, the…
  22. Routing is essential in the following type of industry
  23. In breakeven analysis, total cost consists of
  24. Which of the following equations is not in conformity with others?
  25. Which of the following is independent of sales forecast?
  26. Value engineering aims at finding out the
  27. Bar charts are suitable for
  28. A critical activity has
  29. A-B-C analysis is used in
  30. The standard time for a job is