What is the correct answer?
4
A secondary auxiliary view is a projection off of the ________.
C. Primary auxiliary view
What is the correct answer?
4
The text height for room names should be set to ________for a drawing that will be plotted to a scale of ¼ = 1'-0.
What is the correct answer?
4
Center lines are used to locate or represent the centers of ________.
What is the correct answer?
4
This type of weld is the most common in structural steel fabrication:
What is the correct answer?
4
Isometric drawings are often used by ________ to help illustrate complex designs.
What is the correct answer?
4
This type of auxiliary view is projected onto a plane that is perpendicular to one of the principal planes of projection:
What is the correct answer?
4
This is used to indicate that a surface is to be machined:
What is the correct answer?
4
In this type of concrete, the steel is pre-tensioned before the superimposed load is applied:
What is the correct answer?
4
To avoid having to dimension to a hidden feature the drafter can utilize a ________ section.
What is the correct answer?
4
The type of line that projects from an object for the express purpose of locating a dimension is a ________ line.
What is the correct answer?
4
Which of the following is one of the basic types of welded joints:
What is the correct answer?
4
To insure that everyone understands what the electrical symbols represent it is customary to include a ________ on the electrical sheet.
What is the correct answer?
4
Most architectural firms and mechanical design companies utilize different categories of blocks. These sets of blocks are usually housed in ________.
What is the correct answer?
4
When adding dimensions to an auxiliary view it will be necessary to use the ________ tool.
What is the correct answer?
4
In developing a multi-view drawing, the drafter can use a ________ line to help locate the top and right side views.
What is the correct answer?
4
The bounding box method for setting up an isometric drawing helps the drafter ________.
A. Confine the isometric drawing to its maximum size
B. Figure what lines are to be illustrated vertical and horizontal
C. Position the isometric drawing in paper space
What is the correct answer?
4
An oil refinery relies on which type of drafter to maintain and update the technical piping drawings used for the construction and maintenance of the facility.
What is the correct answer?
4
In isometric projection, all distances are approximately this percentage of their true size:
What is the correct answer?
4
In architectural drawing ________ are often used to illustrate and detail structural components.
A. Foundation beam detail sections
What is the correct answer?
4
When using versions of Auto-CAD prior to Release 2006 it may be necessary to ________ a block in order to edit it.
What is the correct answer?
4
The UCS icon represents the intersection of the ________.
What is the correct answer?
4
This is the theoretically exact size from which limits of size are determined:
What is the correct answer?
4
The first step in creating a traditional technical drawing is to ________.
A. Draw a series of guide lines
C. Align the paper so that it will be positioned square to the parallel bar
D. Sharpen the leads in the technical pens
What is the correct answer?
4
The default position of the UCS icon is positioned at ________ on the AutoCAD grid.
What is the correct answer?
4
Before starting an isometric drawing in Auto-CAD the drafter needs to ________.
A. Set the grid to isometric
B. Set the current layer to Defpoints
What is the correct answer?
4
This is a thin solid line directing attention to a note or dimension and starting with an arrowhead or dot:
What is the correct answer?
4
This material is used in masonry construction, most commonly for ornamental facing:
What is the correct answer?
4
In offset sections, offsets or bends in the cutting plane are all:
C. Either 90 or 180 degrees
What is the correct answer?
4
Lines of an isometric drawing that are not parallel to the isometric axes are called this:
What is the correct answer?
4
EDM is the acronym for:
A. Enterprise data management
B. Engineering drawing management
C. Enterprise drawing manipulation
D. Engineering data manipulation