Travel charts are used to

A. Analyse material handling

B. Determine inventory control difficulties

C. Plan material handling procedure and routes

D. All of the above

Related Questions

  1. Material handling and plant location is analysed by
  2. PERT stands for
  3. The linear programming techniques can be applied successfully to industries like
  4. Bar chart is suitable for
  5. Standard time is defined as
  6. If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual…
  7. In Halsey 50-50 plan, output standards are established
  8. Which of the following are the guidelines for the construction of a network diagram?
  9. Merit Rating is the method of determining worth of
  10. A big advantage of PERT over Gantt charts is that in the former case
  11. Pick up the incorrect statement about advantages of work sampling
  12. Work study comprises following main techniques
  13. Which of the following depreciation system ensures that the interest be charged on the cost of machine…
  14. Indirect expenses include
  15. A-B-C analysis is used in
  16. When slack of an activity is positive
  17. Breakeven analysis consists of
  18. The appellate authority for an industrial dispute is
  19. CPM stands for
  20. The probability distribution of activity times in PERT follows following distribution
  21. 'Value' for value engineering and analysis purposes is defined as
  22. CPM has following time estimate
  23. One of the basic essentials of an incentive plan is that
  24. Pick up the incorrect statement from the following. A critical ratio scheduling
  25. The time of completing a project in network analysis is given by following time of the critical activity…
  26. Line organisation is suitable for
  27. PERT is applied for
  28. What does symbol 'O' imply in work study?
  29. In the perpetual inventory control, the material is checked when it reaches its
  30. M.T.M. is used to

Please do not use chat terms. Example: avoid using "grt" instead of "great".