Related Questions
What is the correct answer?
4
When creating your own blocks it is important to avoid drawing any portion of the block in the ________ layer.
What is the correct answer?
4
This is the term for the range of tightness or looseness resulting from the allowances and tolerances in mating parts:
What is the correct answer?
4
In the mechanical design process the first step is to ________.
B. Prepare rough sketches
What is the correct answer?
4
When using versions of Auto-CAD prior to Release 2006 it may be necessary to ________ a block in order to edit it.
What is the correct answer?
4
In order to create an accurate assembly drawing the drafter should create the ________ drawings first.
What is the correct answer?
4
These types of pipes are generally connected with bell and spigot joints or flanged joints:
What is the correct answer?
4
In multi-view drawing it is common practice to include three views, the front, the top and the right side. If no dimensions are required on the right side view the drafter can ________.
C. Use the left view instead
What is the correct answer?
4
This is the range of digital or hard copy documents that specify the physical function requirements for a product:
What is the correct answer?
4
The type of line that projects from an object for the express purpose of locating a dimension is a ________ line.
What is the correct answer?
4
Before starting an isometric drawing in Auto-CAD the drafter needs to ________.
A. Set the grid to isometric
B. Set the current layer to Defpoints
What is the correct answer?
4
This is a conical-shaped recess around a hole, often used to receive a tapered screw head:
What is the correct answer?
4
PDM is the acronym for:
A. Project drawing management
B. Product drawing manipulation
C. Product data management
D. Project data manipulation
What is the correct answer?
4
These are joined together in the field to build a structure:
D. Assembled fabrications
What is the correct answer?
4
When only a small section of an interior area needs to be revealed the drafter can use a ________ section.
What is the correct answer?
4
The text used on a typical detail sheet should be ________.
C. In an architectural text style
What is the correct answer?
4
In this type of section, one quarter of the object is removed:
What is the correct answer?
4
This is used in drawings to represent the edge of a solid object:
What is the correct answer?
4
When drawing a line using the relative coordinate system a line is created from ________.
B. The ending point of the last line
C. The beginning point of the last line
What is the correct answer?
4
The edges of a cube in isometric projection make angles of this many degrees with each other:
What is the correct answer?
4
Dimension text is generally placed above the ________ line.
What is the correct answer?
4
EDM is the acronym for:
A. Enterprise data management
B. Engineering drawing management
C. Enterprise drawing manipulation
D. Engineering data manipulation
What is the correct answer?
4
The title block used on working drawings should include the __________.
What is the correct answer?
4
Schematic and single-line diagrams should be arranged so that signal or transmission path from input to output proceeds in this fashion:
A. Right to left and top to bottom
B. Right to left and bottom to top
C. Left to right and top to bottom
D. Left to right and bottom to top
What is the correct answer?
4
Most architectural drawings produced for field use by building contractors are printed on architectural D size paper which measures ________.
What is the correct answer?
4
An accurate record of changes made to release drawings is tracked via this:
What is the correct answer?
4
On a floor plan the dashed line that appears approximately 24 outside the exterior wall represents the __________.
What is the correct answer?
4
If designs require changes, they should be documented with:
D. Engineering change orders
What is the correct answer?
4
This is the most common application for developments and intersections:
A. Sheet metal construction
D. Mechanical engineering
What is the correct answer?
4
A line drawn with a long section, short dash, and another long section is a ________.
C. Center axis of a hidden cylinder
What is the correct answer?
4
Students can complete an associate's degree in drafting which normally takes about ________ years to complete.