'Value' for value engineering and analysis purposes is defined as

A. Purchase value

B. Saleable value

C. Depreciated value

D. Function/cost

Please do not use chat terms. Example: avoid using "grt" instead of "great".

You can do it
  1. The time required to complete a job is established and a bonus is paid to the worker based on the exact…
  2. Material handling and plant location is analysed by
  3. Queueing theory is used for
  4. P.M.T.S. (Predetermined Motion Time Systems) include
  5. Routing assists engineers in deciding in advance
  6. A graphical device used to determine the breakeven point and profit potential under varying conditions…
  7. Which one of the following techniques is used for determining allowances in time study?
  8. Positive slack on a PERT indicates that project is
  9. The salient feature of functional organisation is
  10. Dummy activities are used to
  11. Which of the following are the guidelines for the construction of a network diagram?
  12. Job evaluation is the method of determining the
  13. Which of the following wage incentive plan is applied to all workers?
  14. Travel charts are used to
  15. CPM is the
  16. Pick up the correct statement about relationship between various floats
  17. A dummy activity in a net work diagram
  18. Which of the following charts are used for plant layout design?
  19. Which of the following statement is correct?
  20. Gantt chart provides information about the
  21. The most popular type of organisation used for Civil Engineering Constructions is
  22. PERT stands for
  23. Direct expenses include
  24. The type of layout used for manufacturing steam turbines, is
  25. The deductions for, employees provident fund start
  26. PERT/CPM, techniques can be used for following applications
  27. Pick up the incorrect statement from the following
  28. If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual…
  29. Work study is concerned with
  30. Current assets include