Sinking fund method
Straight line method
ABC charging method
Annuity charging method
D. Annuity charging method
8
12
16
20
Process layout
Product layout
Fixed position layout
Plant layout
Depreciation value of a product
Resale value of a product
Major function of the item and accomplishing the same at least cost without change in quality
Breakeven point when machine requires change
Acceptance sampling
Linear regression
Performance rating
Work sampling
Large project
Major work
Minor work
All of these
When work should start and how much work should be completed during a certain period
When work should complete
That how idle time can be minimized
Proper utilisation of machines
To concentrate his attention on critical activities
To divert the resources from noncritical advanced activities to critical activities
To be cautious for avoiding any delay in the critical activities to avoid delay of the whole project
All of the above
A project is divided into various activities
Required time for each activity is established
Sequence of various activities is made according to their importance
All of the above
Management
Labour court
High court/supreme court
Board of directors
Minor works
Major works
Large projects
All of the above
Customer satisfaction
Function concept
Profit maximisation
Cost reduction
Work sampling
Time study
Method study
Work study
Line organisation
Functional organisation
Line and staff organisation
Line, staff and functional organisation
Producing more with increased inputs
Producing more with the same inputs
Eliminating idle time
Minimising resource waste
2 HA
1.33 HA
1.5 HA
1.15 HA
Keep all the handling to the minimum
Select only efficient handling equipment
Move the heaviest weight to the least distance
All of the above
Component design
Route sheet
Time standards
All of these
Effective running of stores
State of merchandise methods of storing and maintenance etc.
Stock control system
All of the above
A job
An individual employee
A particular division in workshop
Machine
Line organisation
Functional organisation
Line and staff organisation
Line, staff and functional organisation
Analysis of a man-work method by using a motion picture camera with a timing device in the field of view
Motion study observed on enhanced time intervals
Motion study of a sequence of operations conducted systematically
Study of man and machine conducted simultaneously
Is artificially introduced
Is represented by a dotted line
Does not require any time
All of the above
An event can't be accomplished until activities leading to it are completed
No activity from any event can be started from preceding event till it is completed
Length of arrow has nothing to do with time
All of the above
A
B
C
None of these
Batch production
Continuous type of product
Effective utilisation of machines
All of the above
An analytic tool in concept
Limit up of event oriented diagrams
Used for research and development projects
All of the above
Job enlargement
Job enrichment
Job rotation
Job evaluation
It represents a situation where extra resources are available and the completion of project is not delayed
It represents that a programme falls behind schedule and additional resources are required to complete the project in time
The activity is critical and any delay in its performance will delay the completion of whole project
Any one of the above
Marketing programmes and advertising programmes
Installation of machinery
Research and development of products
All of these
Assist in finding out the most efficient way of doing work
Train the individual operator regarding the motion economy principles
Help in collecting the motion time data for synthetic time standards
All of the above