Home

Which of the following organisations is best suited for steel plants

A. Functional organisation

B. Line organisation

C. Staff organisation

D. Line, staff and functional organisations

Please do not use chat terms. Example: avoid using "grt" instead of "great".

You can do it
  1. If A is the total items consumed per year, P is the procurement cost per order, and C is the annual…
  2. The disadvantage of product layout is
  3. PERT is the
  4. When slack of an activity is positive
  5. Process layout is also known as
  6. Critical path moves along the activities having total float of
  7. A systematic job improvement sequence will consist of
  8. The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most…
  9. One time measurement unit (TMU) in method time measurement system equals
  10. Performance rating is equal to
  11. Work study is concerned with
  12. A diagram showing the path followed by men and materials while performing a task is known as
  13. The first method invented for planning projects was
  14. In the perpetual inventory control, the material is checked when it reaches its
  15. O on a PERT/CPM chart represents
  16. An optimum project schedule implies
  17. Breakeven analysis is a
  18. Pick up the incorrect statement from the following
  19. In manufacturing management, the term 'Dispatching' is used to describe
  20. For a product layout the material handling equipment must
  21. Micro-motion study is
  22. In a line organisation
  23. A PERT network has three activities on critical path with mean time 3, 8 and 6 and standard deviations…
  24. Critical Path Net Work helps an engineer
  25. A device used for lifting or lowering objects suspended from a hook at the end of retractable chains…
  26. Military organisation is known as
  27. The objective of time study is to determine the time required to complete a job by
  28. Scheduling
  29. What does symbol 'D' imply in work study?
  30. The main objective of work measurement is to