Related Questions
What is the correct answer?
4
Pozzolana cement is used with confidence for construction of
What is the correct answer?
4
Construction joints are generally provided in concrete
What is the correct answer?
4
An aggregate is said to be flaky, if its least dimension is less than
What is the correct answer?
4
The ratio of the diameter of reinforcing bars and the slab thickness is
What is the correct answer?
4
Due to circumferential action of the spiral in a spirally reinforced column
A. Capacity of column is decreased
B. Ductility of column reduces
C. Capacity of column is decreased but ductility of column increases
D. Both the capacity of column and ductility of column increase
What is the correct answer?
4
The recommended value of modular ratio for reinforced brick work is
What is the correct answer?
4
Grading of sand causes great variation in
A. Workability of concrete
C. Durability of concrete
What is the correct answer?
4
Ordinary concrete is not used for concrete grade
What is the correct answer?
4
Under normal conditions using an ordinary cement, the period of removal of the form work, is:
A. 7 days for beam soffits
B. 14 days for bottom slabs of spans 4.6 m and more
C. 21 days for bottom beams over 6 m spans
What is the correct answer?
4
Admixtures which cause early setting and hardening of concrete are called
A. Workability admixtures
What is the correct answer?
4
The main reinforcement in the toe of a T-shaped R C. retaining wall is provided on
(i) Top face parallel to the wall
(ii) Top face perpendicular to the wall
(iii) Bottom face parallel to the wall
(iv) Bottom face perpendicular to the wall The correct answer is
B. (i) and (ii) are correct
C. (iii) and (iv) are correct
What is the correct answer?
4
The maximum percentage of chemical ingredient of cement is that of
What is the correct answer?
4
Assertion A : The load factor for live load is greater than that for dead load. Reason R : The live loads are more uncertain than dead loads. Select your answer based on the coding system given below:
A. Both A and R is true and R is the correct explanation of A
B. Both A and R is true but R is not the correct explanation of A
C. A is true but R is false
D. A is false but R is true
What is the correct answer?
4
The design yield stress of steel according to IS: 4561978 is: (Where fy is the characteristic yield strength of steel)
What is the correct answer?
4
Workability of concrete is inversely proportional to
What is the correct answer?
4
For a cantilever of effective depth of 0.5 m, the maximum span to satisfy vertical deflection limit is
What is the correct answer?
4
Due to shrinkage stresses, a simply supported beam having reinforcement only at bottom tends to
C. Deflect downward or upward
What is the correct answer?
4
If the depth of actual neutral axis in a beam is more than the depth of critical neutral axis, then the beam is called
What is the correct answer?
4
A higher modular ratio shows
A. Higher compressive strength of concrete
B. Lower compressive strength of concrete
C. Higher tensile strength of steel
D. Lower tensile strength of steel
What is the correct answer?
4
To ensure constant moisture content in aggregates
A. Area of each aggregate pile should be large
B. Height of each aggregate pile should not exceed 1.50 m
C. Aggregate pile should be left for 24 hours before aggregates are used
What is the correct answer?
4
Critical section for shear in case of flat slabs is at a distance of
A. Effective depth of slab from periphery of column/drop panel
B. d/2 from periphery of column/capital/ drop panel
C. At the drop panel of slab
D. At the periphery of column
What is the correct answer?
4
Pick up the incorrect statement applicable to the field test of good cement.
A. When one thrusts one's hand into a bag of cement, one should feel warm
B. The colour of the cement is bluish
C. By rubbing cement in between fingers, one should feed rough
What is the correct answer?
4
The load factors for live load and dead load are taken respectively as
What is the correct answer?
4
The grade of concrete M 150 means that compressive strength of a 15 cm cube after 28 days, is
What is the correct answer?
4
An ordinary Portland cement when tested for its fineness, should not leave any residue on I.S. sieve No. 9, more than
What is the correct answer?
4
The process of mixing, transporting, placing and compacting concrete using Ordinary Port land Cement should not take more than
What is the correct answer?
4
In working stress design, permissible bond stress in the case of deformed bars is more than that in plain bars by
What is the correct answer?
4
The type of aggregates of same nominal size, which contain less voids when compacted, are
What is the correct answer?
4
To obtain cement dry powder, lime stones and shales or their slurry, is burnt in a rotary kiln at a temperature between
What is the correct answer?
4
Internal friction between the ingredients of concrete, is decreased by using
D. More water and coarse aggregates