Increases
Decreases
First increases to a certain maximum value and then decreases
First decreases to a certain minimum value and then increases
C. First increases to a certain maximum value and then decreases
In stone arches, the stones are placed with their natural beds radial
In cornices, the stones are placed with their natural beds as vertical
In stone walls, the stones are placed with their natural beds as horizontal
All the above
Less than one year
1 to 5 years
5 to 10 years
More than 10 years
Less than 1
Equal to 1
Greater than 1
Less than 1 in beams but greater than 1 in channels
Granite
Basalt
Slate
Pumice
Granite
Dolerite
Basalt
All the above
Retaining walls
Columns
Piers
Combustion chambers
25 mm to 50 mm
50 mm to 100 mm
100 mm to 125 mm
125 mm to 150 mm
Bessemer pig
Grey or foundry pig
White or forge pig
Mottled pig
Di-calcium silicate
Tri-calcium silicate
Tri-calcium aluminate
All of the above
160 N/mm²
260 N/mm²
420 N/mm²
520 N/mm²
3.5 N/mm²
7.0 N/mm²
10.5 N/mm²
14.0 N/mm²
Crushing test of stone
Hardness test of stone
Impact test of stone
Water absorption test
Shale powder
Talc powder
Asbestos powder
Plastic powder
400
425
450
500
1 : 2
1 : 3
1 : 4
1 : 6
Brick laid with its length parallel to the face or direction of wall
Brick laid with its breadth parallel to the face or direction of wall
Brick having the same length and depth as the other bricks but half the breadth
Brick with half the width at one end and full width at the other
An apparatus to lift the stone
A depression on a face of brick
Vertical joint in a brick work
Soaking brick in water
English bond
Double Flemish bond
Zigzag bond
Single Flemish bond
Made with finely powdered chalk and linseed oil
Used for fixing glass panes
Softened by a solution of pearl ash and quick-lime soaked in water
All the above
Aluminium carbide
Boric acid
Silicon
All of these
Cellulose acetate plastics
Polyvinyl chloride plastics
Phenol formaldehyde plastic
Urea formaldehyde plastic
Bessemer pig
Grey pig
White forge pig
Mottled pig
To impart hydraulicity
To prevent shrinkage
To decrease the cost of construction
To decrease the setting time
Slump is 50 to 75 mm
Flexural strength at 90 days is 0.2 N/mm2
Compressive strength at 90 days is 1.5 N/mm2
All the above
Solder material is an alloy which melts at a temperature above 400°C
Brazing is done at temperature above 600°C to 1100°C
Brazing joint is stronger than the solder joint
All the above
Neutral refractory bricks
Acid refractory bricks
Basic refractory bricks
All the above
Lime (CaO) 45%
Silica (SiO2) 35%
Alumina (Al2O3) 12% and MgO, CaSO4, KMnO2 and FeO 8%
All the above
Sedimentary rock
Igneous rock
Metamorphic rock
Stratified rock
700 m3 air is required
20 kg limestone is required
One quintal coke is required
All the above
Radius of its stem
Circumference of its stem
Number of branches
Number of annual rings