It takes less time for burning
It gives more output of first class bricks
It has less initial cost
It is suitable when bricks are required in large numbers
C. It has less initial cost
25 %
50 %
75 %
100 %
Organic material
Synthetic material
Petroleum product
Coal
Quick lime is obtained by burning pure lime stone
Hydraulic lime is obtained by burning lime stone containing clay 5% to 30%
Poor lime is obtained by burning lime stone containing impurities more than 5%
All the above
About 20% to 30% of alumina
About 50% to 60% of silica
Not more than 5% of lime
All the above
Odourless
Non-toxic
Transparent
All of these
Gypsum
Acid-resistant cement
Quick lime
All of these
Chromium
Nickel
Tungsten
None of these
Cast iron
Wrought iron
Steel
All the above
Distempered
Painted
Painted and distempered
Used for furniture
Lime and silica
Lime and alumina
Silica and alumina
Lime and iron
25 mm to 50 mm
50 mm to 100 mm
100 mm to 125 mm
125 mm to 150 mm
Quality of water
Quantity of aggregate
Quantity of cement
Water-cement ratio
A.C. pipes, G.I. pipes, C.I. pipes, PVC pipes
C.I. pipes, G.I. pipes, A.C. pipes, PVC pipes
C.I. pipes, G.I. pipes, PVC pipes, A.C. pipes
None of these
Decomposed laterite
Crushed granite
Water bound pebbles
Air weathered rock
Setting time of cement
Soundness of cement
Tensile strength of cement
Compressive strength of cement
10 × 10 × 9 cm
19 × 9 × 9 cm
22.5 × 10 × 8.5 cm
22.5 × 8.0 × 9 cm
Bauxite
Gypsum
Lime stone
None of these
Sedimentary rocks
Metamorphic rocks
Igneous rocks
All the above
Bessemer pig
Grey or foundry pig
White or forge pig
Mottled pig
Is used as water proofing material
Is used as damp proofing material
Is made from bitumen and hessian fibres
All the above
Sulphur
Carbon
Phosphorus
Silicon
Air bubbles in casting produce a dull sound by tapping their surfaces lightly with a hammer
Cupola furnace is used for the manufacture of cast iron
Red short iron is of no value for welding purpose
All the above
Structural works in beams
Small sized water pipes
Columns and struts
None to these
40 to 45
50 to 55
60 to 65
70 to 75
Greater tensile strength in longer direction
Greater tensile strength in shorter direction
Same tensile strength in all directions
None of the above
Chalk
Lime
Lime putty
Cement wash
5% to 15%
10% to 25%
15% to 25%
20% to 30%
1.5 to 2.0
2.0 to 2.5
2.5 to 3.0
3.0 to 3.5
700 m3 air is required
20 kg limestone is required
One quintal coke is required
All the above
10 %
15 %
20 %
25 %