Question No : 36
The ceiling height of a building is
Question No : 37
The form work from the underside of slabs, can be removed only after
Question No : 38
In horizontal D.P.C, thickness of cement concrete (1 : 2 : 4) is
Question No : 39
The minimum width of a stair in residential buildings, is
Question No : 40
Rotary drilling is the fastest method in case of
Question No : 41
The projections of head or sill of a door or window frame are
Question No : 42
The highest line of sloping roof, where two opposite slopes meet, is known as