Home
Current Affairs January 2024

What is the correct answer?

4

While designing the pile as a column, the end conditions are nearly

A. Both ends hinged

B. Both ends fixed

C. One end fixed and other end hinged

D. One end fixed and other end free

Correct Answer :

C. One end fixed and other end hinged


Related Questions

What is the correct answer?

4

Pick up the incorrect statement from the following:

A. A rich mix of concrete possesses higher strength than that a lean mix of desired workability with excessive quantity of water

B. The strength of concrete decreases as the water cement ratio increases

C. Good compaction by mechanical vibrations, increases the strength of concrete

D. None of these

What is the correct answer?

4

If aggregates completely pass through a sieve of size 75 mm and are retained on a sieve of size 60 mm, the particular aggregate will be flaky if its minimum dimension is less than

A. 20.5 mm

B. 30.5 mm

C. 40.5 mm

D. 50.5 mm

What is the correct answer?

4

The ratio of various ingredients (cement, sand, aggregates) in concrete of grade M 200, is

A. 1 : 2 : 4

B. 1 : 3 : 6

C. 1 : 1 ½ : 3

D. 1 : 1 : 2

What is the correct answer?

4

For construction of structures in sea water, the cement generally preferred to, is

A. Portland-pozzolana cement

B. Quick setting cement

C. Low heat Portland cement

D. Rapid hardening cement

What is the correct answer?

4

Batching error means inaccuracy in the quantity of

A. Aggregates

B. Cement

C. Water

D. All the above

What is the correct answer?

4

If the slump of a concrete mix is 60 mm, its workability is

A. Very low

B. Low

C. Medium

D. High

What is the correct answer?

4

Half of the main steel in a simply supported slab is bent up near the support at a distance of x from the center of slab bearing where x is equal to (Where l is the span)

A. l/3

B. l/5

C. l/7

D. l/10

What is the correct answer?

4

Select the incorrect statement

A. Lean mixes bleed more as compared to rich ones.

B. Bleeding can be minimized by adding pozzolana finer aggregate

C. Bleeding can be increased by addition 'of calcium chloride

D. None of the above

What is the correct answer?

4

Bulking of sand is

A. Mixing of different sizes of sand particles

B. Mixing of lime with sand

C. Maximum water with sand

D. Swelling of sand when wetted

What is the correct answer?

4

Ordinary Portland cement is manufactured from

A. Lime stone and clay

B. Gypsum and lime

C. Pozzolana

D. Lime, pozzolana and clay

What is the correct answer?

4

The fineness modulus of fine aggregate is in the range of

A. 2.0 to 3.5

B. 3.5 to 5.0

C. 5.0 to 7.0

D. 6.0 to 8.5

What is the correct answer?

4

Gypsum is added for

A. Colour

B. Strength

C. Controlling setting time

D. None of these

What is the correct answer?

4

If the size of panel in a flat slab is 6 m × 6 m, then as per Indian Standard Code, the widths of column strip and middle strip are

A. 3.0 m and 1.5 m

B. 1.5 m and 3.0 m

C. 3.0 m and 3.0 m

D. 1.5 m and 1.5 m

What is the correct answer?

4

Due to circumferential action of the spiral in a spirally reinforced column

A. Capacity of column is decreased

B. Ductility of column reduces

C. Capacity of column is decreased but ductility of column increases

D. Both the capacity of column and ductility of column increase

What is the correct answer?

4

A concrete having a slump of 6.5 cm, is said to be

A. Dry

B. Earth moist

C. Semi-plastic

D. Plastic

What is the correct answer?

4

For the construction of cement concrete dams, the maximum permissible size of the aggregates, is

A. 40 mm

B. 50 mm

C. 60 mm

D. 70 mm

What is the correct answer?

4

Pre-stress loss due to friction occurs

A. Only in post-tensioned beams

B. Only in pre-tensioned beams

C. In both post-tensioned and pre-tensioned beams

D. None of the above

What is the correct answer?

4

Grading of sand causes great variation in

A. Workability of concrete

B. Strength of concrete

C. Durability of concrete

D. All the above

What is the correct answer?

4

The diameter of the Vicat plunger is 10 mm and its length varies from

A. 20 mm to 30 mm

B. 30 mm to 40 mm

C. 40 mm to 50 mm

D. 50 mm to 60 mm

What is the correct answer?

4

For concreting tunnel linings, transportation of concrete is done by

A. Pans

B. Wheel borrows

C. Containers

D. Pumps

What is the correct answer?

4

Pick up the incorrect statement from the following:

A. The bottom and top ends of slump mould are parallel to each other

B. The axis of the mould is perpendicular to the end faces

C. The internal surface of the mould is kept clean and free from set cement

D. The mould is in the form of a frustum of hexagonal pyramid

What is the correct answer?

4

The effect of creep on modular ratio is

A. To decrease it

B. To increase it

C. Either to decrease or to increase it

D. To keep it unchanged

What is the correct answer?

4

Setting time of cement increases by adding

A. Gypsum

B. Hydrogen peroxide

C. Calcium chloride

D. Sodium oxide

What is the correct answer?

4

Poisson's ratio for concrete

A. Remains constant

B. Increases with richer mixes

C. Decreases with richer mixes

D. None of the above

What is the correct answer?

4

The size of fine aggregates does not exceed

A. 2.75 mm

B. 3.00 mm

C. 3.75 mm

D. 4.75 mm

What is the correct answer?

4

Hardening of cement occurs at

A. Rapid rate during the first few days and afterwards it continues to increase at a decreased rate

B. Slow rate during the first few days and afterwards it continues to increase at a rapid rate

C. Uniform rate throughout its age

D. None of these

What is the correct answer?

4

The temperature reinforcement in the vertical slab of a T-shaped R.C. retaining wall is

A. Not needed

B. Provided equally on inner and front faces

C. Provided more on inner face than on front face

D. Provided more on front face than on inner face

What is the correct answer?

4

Sand generally contains salt if it is obtained from:

A. Nala beds

B. River beds

C. Sea beds

D. None of these

What is the correct answer?

4

Pick up the correct statement from the following:

A. The free water is the amount of water added while mixing and the amount of water held on the surface of the aggregates prior to mixing

B. The total water is the free water and the amount actually absorbed by the aggregates

C. Neither (a) nor (b)

D. Both (a) and (b)

What is the correct answer?

4

Strength of concrete increases with

A. Increase in water-cement ratio

B. Increase in fineness of cement

C. Decrease in curing time

D. Decrease in size of aggregate