5 %
10 %
15 %
20 %
A. 5 %
Decreases workability
Increases strength
Increases heat of hydration
None of these
Increasing the depth of beam
Using thinner bars but more in number
Using thicker bars but less in number
Providing vertical stirrups
In properly graded aggregates, bulk density is more
In single size aggregates, bulk density is least
In single size aggregates, bulk density is maximum
None of these
10 %
20 %
30 %
40 %
2/3 mean dimension
3/4 mean dimension
3/5 mean dimension
5/8 mean dimension
Full capacity of the ware house
Pressure exertion of the bags of upper layers
Pressure compaction of the bags on lower layers
Packing the ware house
Placing
Wetting
Curing
Compacting
Sand obtained from pits, is washed to remove clay and silt
Sand obtained from flooded pits, need not be washed before use
The chloride in sea shore sand and shingle may cause corrosion of reinforcement if the concrete is porous
All the above
Fineness test
Consistency test
Test for setting time
Test for tensile strength
Space between the exterior walls of a warehouse and bag piles should be 30 cm
Cement bags should preferably be piled on wooden planks
Width and height of the pile should not exceed 3 m and 2.70 m respectively
None of these
10 to 15% more
15 to 20% more
20 to 25% more
25 to 50% more
Front face only
Inner face only
Both front face and inner face
None of the above
Increasing the depth
Providing shear reinforcement
Using high strength steel
Using thinner bars but more in number
3.5 m
4 m
4.5 m
5 m
Smooth
Granular
Glassy
Honey combed and porous
Sodium sulphates
Sodium chlorides
Sodium carbonates and bicarbonates
Calcium bicarbonates
Fly ash
Hydrated lime
Calcium chloride
All the above
1 : 3 : 6
1 : 2 : 4
1 : 1 ½ : 3
1 : 4 : 8
Shear strength
Tensile strength
Compressive strength
None of these
0.15
0.12
0.30
1.00
Bleeding
Creeping
Segregation
Shrinkage
10 %
12.5 %
15 %
18.5 %
0.37 fy
0.57 fy
0.67 fy
0.87 fy
Top face perpendicular to wall
Bottom face perpendicular to wall
Both top and bottom faces perpendicular to wall
None of the above
Insufficient quantity of water makes the concrete mix harsh
Insufficient quantity of water makes the concrete unworkable
Excess quantity of water makes the concrete segregated
All the above
Grading of aggregates
Surface area of aggregates
Shape of aggregates
All the above
1.5
2.0
2.5
3.0
A horizontal line
A vertical line
N.W. inclined line
N.E. inclined line
Reduces workability
Increases bleeding
Increases shrinkage
Increases strength
Increase in water-cement ratio
Increase in fineness of cement
Decrease in curing time
Decrease in size of aggregate