Reinforced marble floor
Terrazzo floor
Marble floor
Chip floor
B. Terrazzo floor
To drain off the water from the filling
To ventilate the stone masonry
To add architectural beauty
To increase compaction of the earth retained
25 mm
25 to 40 mm
40 to 65 mm
65 to 100 mm
Hip
Gable
Ridge
Eaves
H-pile
Pipe pile
Screw pile
Disc pile
Double Flemish bond facing and English bond backing in each course
English bond facing and double Flemish bond backing in each course
Stretcher bond facing and double Flemish bond backing in each course
Double Flemish bond facing and header bond backing in each course
Gable roof
Hip roof
Gambrel roof
Mansard roof
Soffits
Voussoirs
Haunches
Spandrils
Uneven settlement of abutments
Sliding of voussoirs
Crushing of the material
All the above
Perpendicular distance between intrados and extrados
Vertical distance between springing line and intrados
Perpendicular distance between springing line and extrados
None of the above
Centring
Actual laying of arch work
Striking of centring
None of the above
1 cm per metre length
2 cm per metre length
4 cm per metre length
5 cm per metre length
To support the common rafter
To support purlins
To prevent the purlins from tilting
All of the above
Louvered door is generally provided in bath rooms
Flush door is generally provided in dining room
Revolving door is generally provided in cinema halls
Sliding door is generally provided in show rooms
40 cm
Equal to flange width
Twice the flange width
Maximum of (a), (b) and (c)
The column spacing
One-third the column spacing
Half the column spacing
Three-fourth the column spacing
2.5 m
3.5 m
4.5 m
5.5 m
5 m
10 m
15 m
20 m
English bond is used for brick masonry to support heavy loads
Double-Flemish bond is suitable for brick masonry to give uniform face appearance
The stretcher bond is used for the construction of half brick masonry brick
All the above
Both A and R is true and R is the correct explanation of A
Both A and R is true but R is not the correct explanation of A
A is true but R is false
A is false but R is true
Transoms
Horns
Stops
Chocks
10 m
20 m
30 m
40 m
Hard rock
Moist clay
Soft rock
Coarse sandy soil
Coastal regions
Plain regions
Covering large areas
All of the above
350
420
450
500
Two directions without break in the slope on each side
Two directions with break in the slope on each side
Four directions without break in the slope on each side
Four directions with break in the slope on each side
1 day
4 days
7 days
14 days
Granite
Marble
Sand stone
Slate
du
1.25 du
1.5 du
1.75 du
1 : 2
1 : 3
1 : 4
1 : 6
Machine foundations
Factory building
Tall structures
All the above